China State Hailong Construction Technology Company Limited

China State Hailong Construction Technology Company Limited (hereinafter referred to as “CSHL”) was established in January 1993 at Shenzhen and incorporated in Hong Kong at 2007, who is a wholly owned subsidiary of China State Construction International Holdings Limited (Stock Code 03311.HK). In 1997, CSHL passed the ISO9000 Quality Management System of Hong Kong Quality Assurance Agency and recognized as a qualified supplier of precast concrete products by Hong Kong government departments such as the Housing Department, Architectural Services Department, Drainage Services Department and Highways Department. In 2015, CSHL has started a modular building investment business, integrating design and development, modular production and consulting services. In 2017, CSHL have been certified to ISO9001: 2015 for Design, Production and Supply of Modular Integrated Construction (MiC) products by the Hong Kong Quality Assurance Agency (HKQAA) and approved as a manufacturer for MiC modular units by Buildings Department (BD) in January 2020 to deal with the design, co-ordination, quality assurance and control in structural and fitting out works as well as MEP service installation during the manufacturing process. Its mainland company, China State Construction Hailong Technology Co., Ltd., holds four major design institutes and seven major production bases in China, and integrates research and development, design, production, and molded buildings into a new comprehensive construction industrialization company. Three of the production bases which are located in Shenzhen, Zhuhai and Jiangmen, are especially responsible for supplying the development needs of Greater Bay Area.

 

Being the fully developed company both in steel and concrete MiC, our technical management team will constantly seek for new technologies and materials to support a one-stop service platform such as design, production, transportation and assembly. Up until now, CSHL have completed a total of 70 MiC projects from Hong Kong, Macau and mainland China which covering four product types such as residential, office, commercial and stylistic class. It is known that the advantages of MiC are outstanding, and it plays an enormous role in promoting the development of new industrial buildings and reforming the construction industry chain. CSHL will continue to explore a new technology of MiC to the path towards sustainable developments and promoting the innovation construction as well as upgrading technology, leading the new trend of the green building to build the city with a happy city life. 

 

Address:    7/F, LiFung Tower, 888 Cheung Sha Wan Road, KLN, H.K.
Tel: (852) 3797 7607

 

Key Features

Courtesy of China State Hailong


A rigid steel plate with oval shape holes in Column is designed as a connection plate, which can facilitate lifting process and long screw rod installation, address right position, and increase structural strength between upper and lower modules during vertical construction.

Courtesy of China State Hailong


Upon pre-completion of finishes, fixtures and fittings of each module are manufactured in factory, the finishing works and building services installation works on site are minimised.

Courtesy of China State Hailong


Each Room comprised different MiC module and in-situ concrete structure, each combined  with shear wall and formed an integrated structure; The finishes, fixtures and fittings are manufactured and completed in factory beforehand, hence a better quality control and a shortened construction period.

Signature Projects

Courtesy of China State Hailong

Design and Construction of A Purpose-built Multi-welfare Services Complex

Area 29 of Kwu Tung North Development Area, Hong Kong

Client:

Architectural Services Department

Project Role: MiC Supplier
No. of Modules: 1,764
CFA/GFA: 44,200 m2
Number of Floors: 8
Number of Units: 1,764 Units
MiC Parts: R.C. Structure MiC;  the finishes, fixtures and fittings are manufactured and completed in factory
Other Project Features: Each Multi-welfare Services Room comprised 6 nos. of module and in-situ concrete structure, each combined  with shear wall and formed an integrated structure; The finishes, fixtures and fittings are manufactured and completed in factory beforehand, hence a better quality control and a shortened construction period.

 

PROJECT DETAILS

Courtesy of China State Hailong

Design and Construction of Community Isolation Facilities at Penny's Bay, Lantau Island and Area adjacent to Kai Tak Cruise Terminal Development, Kowloon

Penny's Bay , Lantau Island & Area adjacent to Kai Tak Cruise Terminal Development, Kowloon, Hong Kong

Client:

Architectural Services Department

Project Role: MiC Supplier
No. of Modules: Around 11,591
Type of Modules: Steel
Number of Floors:
Number of Units: 11,591 Units
Project Period: Year of 2020 to 2022
MiC Parts: Numerous and vertical construction system
Other Project Features: Steel Structure MiC; completed finishes, fixtures and fittings are manufactured in factory; from design, supply and delivery to site, using its rapid production and construction methods to complete multiple Community Isolation Facilities projects.
Courtesy of China State Hailong

Provision of Temporary Quarantine Facilities

Lei Yue Mun Park and Holiday Village, Hong Kong

Client: Architectural Services Department
Project Role: MiC Supplier
No. of Modules: 118+234
GFA: Site A:1,977 m2
Site B:5,976 m2
Number of Floors: Site A:1 Floor / Temporary
Site B:2 Floors / Permanent
Number of Units: 352 Units
Project Period: Jan 2020 - Mar 2020
MiC Parts: Numerous and vertical construction system
Other Project Features:  Steel Structure MiC; completed finishes, fixtures and fittings are manufactured in factory; design, supply and delivery to site around 40 days for whole project.

 

PROJECT DETAILS

Courtesy of China State Hailong

Baguang Ecological International Hotel in Shenzhen

Dapeng New Area, Shenzhen

Project Role: EPC Project- Design、fabrication and construction
No. of Modules: 1,660
Type of Modules: Steel
GFA: 253,000 m2
Number of Floors: six 7-storey hotels, one 7-storey dormitory, four 18-storey hotels, one 18-storey dormitory and independent supporting rooms
Project Period: Year 2021, Total construction period 124 Days
MiC Parts: Numerous and vertical construction system
Other Project Features: 

Steel Structure MiC; completed finishes, fixtures and fittings are manufactured in factory. The project will be transformed into a dormitory for students of Ocean University in the future according to the function conversion of "combination of normal situation and epidemic situation".The construction speed of multi-story hotel ranks first in China, and the first two multi-story buildings have been built in only 44 days.

  • China's first 7-storey modular permanent building project
  • China’s first integrated permanent hotel project for epidemic prevention.
  • Project with full marks according to "Shenzhen Prefabricated Building Scoring Rules"
Courtesy of China State Hailong

The Development of Chinese Medicine Hospital in Tseung Kwan O

Tseung Kwan O, Hong Kong

Client: Architectural Services Department
Project Role: MiC Supplier
No. of Modules: 1195 Steel MiC and 1051 Concrete MiC
Type of Modules:  Steel and Concrete
Number of Floors: 7 storey (CMH) Chinese Medicine Hospital and 5 storey (GCMTI) Government Chinese Medicines Testing Institute
MiC Parts: Lifting type and Sliding type installation methods
Other Project Features:  Hong Kong’s first MiC Chinese Medicine Hospital

 

PROJECT DETAILS

Courtesy of China State Hailong

North Lantau Hospital Hong Kong Infection Control Center

North Lantau Island, Hong Kong

Project Role: MiC Supplier
No. of Modules: 524
Type of Modules: Steel
Number of Floors: 2
Other Project Features:  According to Hong Kong's permanent building design standards, It took 2.5 months to complete the production of the module, 1 month for on-site installation, the construction process has been shortened to 4 months.

 

PROJECT DETAILS

Courtesy of China State Hailong

Zhangkengjing project in Longhua District, Shenzhen

Longhua District, Shenzhen

Project Role: EPC Project- Design、fabrication and construction
No. of Modules: 6,028
Type of Modules: Concrete
GFA: 173,000 m2
Number of Floors: five 28-storey high-rise residential buildings with the height of 99.7 meters
Project Period: 365 days
MiC Parts: Numerous and vertical construction system
Other Project Features: 

China's first high-rise concrete MiC project and the highest modular building by 2024. 

 

PROJECT DETAILS

Courtesy of China State Hailong

Retrofitting Project with Elevators in Nigang Campus of Shenzhen Middle School

Shenzhen

Project Role: EMiC Supplier
No. of Modules: 30
Type of Modules: Steel
Number of Floors: 15 storey MiC elevators 
Project Period: 66 days

Other Project Features: 

  • Key pilot project in Shenzhen.
  • China's first high-rise building with double-car elevator MiC technology.
  • It took 66 days from the foundation construction to the delivery of elevators, and the installation of the 15-storey MiC elevators was completed 54% shorter than the 145 days of on-site construction.
Courtesy of China State Hailong

Subsidised Sale Flats Project at Anderson Road Quarry Site R2-2

Anderson Road, Hong Kong

Client Hong Kong Housing Society
Project Role: MiC Supplier
No. of Modules: 2,158
Type of Modules: Concrete
Number of Floors: Two 21-storey residential towers and three 15-storey residential towers
Features of MiC:  Adopt MiC Kitchen and Toilet
Courtesy of China State Hailong

Design and Construction of Public Housing Development at Kwu Tung North Area 19 Phase 2

Kwu Tung North, Hong Kong

Client Hong Kong Housing Authority
Project Role: MiC Supplier
No. of Modules: 6,314
Type of Modules: Concrete
Number of Floors: 6 blocks of 38 - 39 storeys residential buildings with a total of 4,336 residential units. Three of which are MiC buildings and the remaining three are traditional buildings.
Features of MiC:  Volumetric module with 5 flat sides and the whole flat adopts MiC 
Other Project Features: 
Hong Kong Housing Authority’s first MiC "Design-and-Build" project
Courtesy of China State Hailong

A 30-classroom primary school at Lin Cheung Road, Sham Shui Po

Lin Cheung Road, Sham Shui Po

Client Architectural Services Department
Project Role: MiC Supplier
No. of Modules: 169
Type of Modules: Concrete
Number of Floors: A 4-storey primary school, providing a total of 30 classrooms, 9 toilets and a pantry
Features of MiC:  Corrugated duct connection

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 29.06.2024 11:31:43

Adopting MiC to Build Light Public Housing (LPH) to Expedite Housing Supply

The Policy Address 2022 announced the construction of LPH. The LPH Scheme is led by the Architectural Services Department with the adoption of MiC. The Housing Bureau has selected eight sites in Tuen Mun, Yuen Long, Ma On Shan, Kai Tak, Ngau Tau Kok and Chai Wai, providing around 30,000 LPH units. The construction period takes only one to two years. Each units equipped with self-contained toilet and basic facilities such as water heater and air-con. The first batch of around 2,100 units will be completed in 2024-25 and the remaining units will be completed by phases in 2025-26 and 2026-27, so as to shorten the waiting time of public housing.