China State Hailong Construction Technology Company Limited

China State Hailong Construction Technology Company Limited is an operating platform undertaking businesses in Hong Kong and Macau, its projects' productions are assigned to Guangdong Hailong Construction Technology Company Limited's production line. Hailong Construction Technology Co., Ltd (Hailong) is a wholly-owned subsidiary of the China State Construction International Ltd., which specialise in precast elements business. Hailong maintains the mindset of market oriented, customer centred, and quality as its fundamental principle, insisting on the idea of high quality management with low cost competition, carrying out the policy in doing a thing right at first and every time, maintaining the fine tradition to unite faithfully, strive arduously, progress vigorously, demand rigorously and contribute actively. With the development goal of establishing evergreen enterprise, Hailong is committed to make positive contribution to the development of building industrialization in China. The company's major products include various types of precast elements such as facade, partition walls, floor slabs, staircases, balconies, primary and secondary beams, columns, composite GRC facade, integrated kitchens and washrooms, bridge deck and box girders. The varies production products including project of residential, commercial, hotel, factory, hospital, school, bridge, road, tunnel, MTR, etc..

 

Hailong was established in 1993 in Shenzhen and Successfully entered Hong Kong's market of precast elements since 1998, it has been recognised as a qualified supplier by Hong Kong Housing Department, Highways Department, Drainage Services Department, ASD, etc. In 2012, based on successful experience of Hong Kong projects, Hailong has become a qualified supplier in the market of Mainland China. At the same year Hailong has also been recognised as “國家高新技術企業” and “深圳市住宅產業化示範基地”. In 2013, Hailong is committed to make positive contribution to the development of building industrialisation in China and was recognised as “國家住宅產業化基地”.

 

Address:    No. 8, Qixing Road, Fushan Industrial park, Doumen District, Zhuhai, P.R.C.
Tel: (852) 8302 2548

 

Key Features

Courtesy of China State Hailong


A rigid steel plate with oval shape holes in Column is designed as a connection plate, which can facilitate lifting process and long screw rod installation, address right position, and increase structural strength between upper and lower modules during vertical construction.

Courtesy of China State Hailong


Upon pre-completion of finishes, fixtures and fittings of each module are manufactured in factory, the finishing works and building services installation works on site are minimised.

Courtesy of China State Hailong


Each Multi-welfare Services Room comprised 6 nos. of module and in-situ concrete structure, each combined  with shear wall and formed an integrated structure; The finishes, fixtures and fittings are manufactured and completed in factory beforehand, hence a better quality control and a shortened construction period.

Signature Projects

Courtesy of China State Hailong

Design and Construction of A Purpose-built Multi-welfare Services Complex

Area 29 of Kwu Tung North Development Area, Hong Kong

Client:

Architectural Services Department

Project Role: MiC Supplier
No. of Modules: 1,764
CFA/GFA: 44,200 m2
Number of Floors: 8
Number of Units: 1,764 Units
MiC Parts: R.C. Structure MiC;  the finishes, fixtures and fittings are manufactured and completed in factory
Other Project Features: Each Multi-welfare Services Room comprised 6 nos. of module and in-situ concrete structure, each combined  with shear wall and formed an integrated structure; The finishes, fixtures and fittings are manufactured and completed in factory beforehand, hence a better quality control and a shortened construction period.

 

PROJECT DETAILS

Courtesy of China State Hailong

Design & Construction of Temporary Quarantine Facilities

Penny's Bay , Lantau Island, New Territories, Hong Kong

Client:

Architectural Services Department

Project Role: MiC Supplier
No. of Modules: Around 700
GFA: 18,188 m2
Number of Floors:
Number of Units: 700 Units
Project Period: May 2020 - Jun 2020
MiC Parts: Numerous and vertical construction system
Other Project Features: Steel Structure MiC; completed finishes, fixtures and fittings are manufactured in factory; design, supply and delivery to site around 40 days for whole project.
Courtesy of China State Hailong

Provision of Temporary Quarantine Facilities

Lei Yue Mun Park and Holiday Village, Hong Kong

Client: Architectural Services Department
Project Role: MiC Supplier
No. of Modules: 118+234
GFA: Site A:1,977 m2
Site B:5,976 m2
Number of Floors: Site A:1 Floor / Temporary
Site B:2 Floors / Permanent
Number of Units: 352 Units
Project Period: Jan 2020 - Mar 2020
MiC Parts: Numerous and vertical construction system
Other Project Features:  Steel Structure MiC; completed finishes, fixtures and fittings are manufactured in factory; design, supply and delivery to site around 40 days for whole project.

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 10.08.2021 14:48:16

Adopting MiC to Build Light Public Housing (LPH) to Expedite Housing Supply

The Policy Address 2022 announced the construction of LPH. The LPH Scheme is led by the Architectural Services Department with the adoption of MiC. The Housing Bureau has selected eight sites in Tuen Mun, Yuen Long, Ma On Shan, Kai Tak, Ngau Tau Kok and Chai Wai, providing around 30,000 LPH units. The construction period takes only one to two years. Each units equipped with self-contained toilet and basic facilities such as water heater and air-con. The first batch of around 2,100 units will be completed in 2024-25 and the remaining units will be completed by phases in 2025-26 and 2026-27, so as to shorten the waiting time of public housing.