Moderna Homes Pte Limited / Moderna Homes (HK) Limited

Mainland China, Singapore, Malaysia

Since 2013, MODERNA HOMES PTE LTD is one of the industry leading modular firm to explore this technology and make it available to our client for high-rise modular construction. Their sterling track record in modular construction (PPVC/ MiC) has positioned them as one of the Top-of-Mind choice in the industry. Modular construction (PPVC/ MiC) can save clients valuable time and provide potential pricing advantages over more traditional building methods, while also improving quality, accelerating project delivery and leading to increase in construction productivity.                                                                                                                                                                                                                 

MODERNA HOMES is a strong believer in using technology for built environment industry to build a better world in an environmentally and sustainability way in order to improve the quality of the environment and communities where people live and work. The use of digital platform in manufacturing had made modular construction more sustainability, faster in construction period and cost effective. Having gained valuable experience from theri various past projects, MODERNA HOMES shall strive to continuously improve on their modular design, digital manufacturering process and workflow to achieve higher productivity target and deliver beyond their clients' expectation.                                                                                                                                                                                                                                   

MODERNA HOMES PTE LTD is wholly owned subisdaiary of BBR holdings Ltd, a public listed company on Singapore Stock Exchanged. MODERNA HOMES is a licenced specialist builder for steel and concrete modular (PPVC/ MiC). Our factories is located in Malaysia, Singapore & OEM. Moderna Homes modular design system has been approved by Hongkong's Building Dapartment's IPA scheme since April 2019.  

Key Features

Courtesy of Moderna Homes


Moderna Homes System is suitable for hostels, hotels, highrise apartments & condominiums, nursing homes, commercial & office buidlings, small modular homes.                                                                                                                               

Moderna Homes System Advantages:                                                                                                                              

  1. Accelerate building completetion compared to traditional construction            
  2. Higher workplace safety as all works are done within controlled factory environment and at ground level   
  3. Higher productivity due to digitalised fabrication and monitoring                           
  4. Higher quality and better internal finishing                                                                         
  5. Less noise and pollution generated on site                                                                      
  6. Reduce carbon footprint lead to more substainability                                                        
  7. Less manpower requirement on site

Signature Projects

Courtesy of Moderna Homes

Nanyang North Hill Student Hostel

Nanyang North Hill, Technological University

Client: Nanyang Technological University 
Project Role: MiC supplier
Types of Module: Steel
No. of MiC Modules: 1,213
PPVC Area (m²): 28,000
No. of Floors: 13
No. of Units: 1,595
Main Contract Period: 2014 - 2016
MiC Part: All the hostel rooms were 100% internally completed with decoration, furniture and all fittings in the factory

 

PROJECT DETAILS

Courtesy of Moderna Homes

Nanyang Crescent Student Hostel

Nanyang Crescent, Nanyang Technological University

Client: Nanyang Technological University 
Project Role: MiC supplier
Types of Module: Steel
No. of MiC Modules: 717
PPVC Area (m²): 22,761
No. of Floors: 13
Main Contract Period: 2015 - 2017
MiC Part: All the hostel rooms were 100% internally completed with decoration, furniture and all fittings in the factory

 

PROJECT DETAILS

Courtesy of Moderna Homes

The Wisteria & Wisteria Mall

Sembawang / Yishun Ring Road

Client: Northernone Development Pte Ltd
Project Role: MiC supplier
Types of Module: Steel hybrid
No. of MiC Modules: 756
PPVC Area (m²): 16,787
No. of Floors: 9- Storey Residential Buildings with 3-storey of podium and 1-level of basement
No. of Units: 216
Main Contract Period: 2015 - 2018
MiC Part: All the residential unit rooms were 100% internally completed with decoration, furniture and all fittings in the factory

 

PROJECT DETAILS

Courtesy of Moderna Homes

Pasir Ris Social Community Facility (Adult Disability Homes)

Pasir Ris

Client: Ministry of Social & Family Development
Project Role: MiC supplier
Types of Module: Steel hybrid
No. of MiC Modules: 252
PPVC Area (m²): 4,933
No. of Floors: 7
Main Contract Period: 2018 - 2020
MiC Part: All the wards and toilets were 100% internally completed with decoration, furniture and all fittings in the factory
Courtesy of Moderna Homes

Nursing Homes at Tampines Ave 2

Tampines Ave 2

Client: Ministry of Health
Project Role: MiC supplier
Types of Module: Steel hybrid
No. of MiC Modules: 437
PPVC Area (m²): 6,860
No. of Floors: 8
Main Contract Period: 2019 - 2020
MiC Part: All the wards, common space and toilets were 100% internally completed with decoration, furniture and all fittings in the factory
Courtesy of Moderna Homes

Tampines North Primary School (Angsana)

Tampines Street 61

Client: Ministry of Education
Project Role: MiC supplier
Types of Module: Steel hybrid
No. of MiC Modules: 132
PPVC Area (m²): 5,949
No. of Floors: 7
No. of Units: 132
Main Contract Period: 2019 - 2020
MiC Part: All the classrooms, lecture rooms, laboratory and educational rooms were 100% internally completed with decoration, furniture and all fittings in the factory
Courtesy of Moderna Homes

Modular Social Housing Scheme - Junction of Sung Wong Toi Road and To Kwa Wan Road Project

Junction of Sung Wong Toi and To kwa Wan Road

Client: Lok Sin Tong 
Project Role: MiC supplier
Types of Module: Steel hybrid
No. of MiC Modules: 108
PPVC Area (m²): 1,862
No. of Floors: 3
No. of Units: 108
Main Contract Period: 2020 - 2021
MiC Part: All the units were 100% internally completed with decoration, furniture and all fittings in the factory

 

PROJECT DETAILS

Courtesy of Moderna Homes

Connect @ Changi Hall 9

Singapore Expo Hall

Client: Temasek / Surbana Jurong Pte LTd / Ministry of Health
Project Role: MiC supplier
Types of Module: Steel
No. of MiC Modules: 182
PPVC Area (m²): 4,466
No. of Floors: 2
No. of Units: 182
Main Contract Period: 2021
MiC Part: All the units were 100% internally completed with decoration, furniture and all fittings in the factory.
Other Project features:

The challenge is the installation of MiC within a Completed Permanent Building. 

                           

  1. The restriction in the use of lifting equipment height. (Not more than 8m high)
  2. Design of loading and unloading frame to suit Method Statement of Installation  
  3. Fabrication of transportation platform for installation of modules to designated location
  4. Handover and complete within 2-3 months for Covid positive patient recovery program     

 

PROJECT DETAILS

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 02.03.2022 18:13:04

Adopting MiC to Build Light Public Housing (LPH) to Expedite Housing Supply

The Policy Address 2022 announced the construction of LPH. The LPH Scheme is led by the Architectural Services Department with the adoption of MiC. The Housing Bureau has selected eight sites in Tuen Mun, Yuen Long, Ma On Shan, Kai Tak, Ngau Tau Kok and Chai Wai, providing around 30,000 LPH units. The construction period takes only one to two years. Each units equipped with self-contained toilet and basic facilities such as water heater and air-con. The first batch of around 2,100 units will be completed in 2024-25 and the remaining units will be completed by phases in 2025-26 and 2026-27, so as to shorten the waiting time of public housing.

HOT TOPIC