China State Hailong Construction Technology Company Limited

China State Hailong Construction Technology Company Limited (hereinafter referred to as “CSHL”) was established in January 1993 at Shenzhen, who is a wholly owned subsidiary of China State Construction International Holdings Limited (Stock Code 03311.HK). In 1997, CSHL passed the ISO9000 Quality Management System of Hong Kong Quality Assurance Agency and recognized as a qualified supplier of precast concrete products by Hong Kong government departments such as the Housing Department, Architectural Services Department, Drainage Services Department and Highways Department.

 

In 2015, CSHL has started a modular building investment business, integrating design and development, modular production and consulting services. In 2017, CSHL have been certified to ISO9001: 2015 for Design, Production and Supply of Modular Integrated Construction (MiC) products by the Hong Kong Quality Assurance Agency (HKQAA) and approved as a manufacturer for MiC modular units by Buildings Department (BD) in January 2020 to deal with the design, co-ordination, quality assurance and control in structural and fitting out works as well as MEP service installation during the manufacturing process.

 

Being the fully developed company both in steel and concrete MiC, our technical management team will constantly seek for new technologies and materials to support a one-stop service platform such as design, production, transportation and assembly. Up until now, CSHL have completed a total of twelve MiC projects from Hong Kong, Macau and mainland China which covering four product types such as residential, office, commercial and stylistic class.

 

It is known that the advantages of MiC are outstanding, and it plays an enormous role in promoting the development of new industrial buildings and reforming the construction industry chain. CSHL will continue to explore a new technology of MiC to the path towards sustainable developments and promoting the innovation construction as well as upgrading technology, leading the new trend of the green building to build the city with a happy city life. 

Signature Projects

Courtesy of China State Hailong

Temporary Quarantine Facilities at Lei Yue Mun Park and Holiday Village (Site A)

75 Chai Wan Road

Client: Architectural Services Department
Project Role:  Structural Engineer / MiC Module Designer
No. of Modules: 118
Type of MiC: Steel
CFA/GFA: 2,052 m2/ 1,977 m2
Number of Floors: 1
Number of Units: 118
Main Contract Period: 25 days
MiC Part: Quarantine rooms
Other project feature: First quanrantine facility in Hong Kong

 

PROJECT DETAILS

Courtesy of China State Hailong

Temporary Quarantine Facilities at Lei Yue Mun Park and Holiday Village (Site B)

75 Chai Wan Road

Client: Architectural Services Department
Project Role:  MiC Module Designer
No. of Modules: 234
Type of MiC: Steel
CFA/GFA: 6,077 m2/ 5,976 m2
Number of Floors: 1&2
Number of Units: 234
Main Contract Period: 55 days
MiC Part: Quarantine rooms
Other project feature: Designed and constructed for permenant use

 

PROJECT DETAILS

Courtesy of China State Hailong

Temporary Quarantine Facilities at Penny's Bay (Phase IB)

Fantasy Road, Penny's Bay

Client: Architectural Services Department
Project Role:  MiC Module Designer
No. of Modules: 702
Type of MiC: Steel
CFA/GFA: 19,982 m2/ 18,188 m2
Number of Floors: 2
Number of Units: 700
Main Contract Period: 73 days
MiC Part: Quarantine rooms and medical posts
Other project feature:
  • Designed and constructed for permenant use
  • 95% prefabrication rate
Courtesy of China State Hailong

Temporary Quarantine Facilities at Penny's Bay (Phase 3B)

Fantasy Road, Penny's Bay

Client: Architectural Services Department
Project Role:  MiC Module Designer
No. of Modules: 1,495
Type of MiC: Steel
CFA/GFA: 26,195 m2/ 25,634 m2
Number of Floors: 2
Number of Units: 850
Main Contract Period: 88 days
MiC Part: Quarantine rooms, staircases, corridors, medical posts, etc.
Other project feature:

Designed and constructed for permenant use

Courtesy of China State Hailong

Relocation of ShaTin Sewage Treatment Caverns Project - Community Liaison Centre

Mui Tsz Lam Road, Ma On Shan, Shatin

Client: Drainage Services Department
Project Role:  Structural Engineer / MiC Module Designer
No. of Modules: 14
Type of MiC: Steel
CFA/GFA: 250 m2
Number of Floors: 1
Number of Units: 14
Main Contract Period: Aug 2019 - July 2020
MiC Part: Community Centre
Other project feature:

First MiC Community Center to Public

 

PROJECT DETAILS

Courtesy of China State Hailong

Organic Waste Treatment Facility Phase2 Temporary Site Office

Ping Che Road, Ping Che, Fanling

Client: Environmental Protection Department
Project Role:  Architectural / Structural Engineer / BS Engineer / MiC Module Designer
No. of Modules: 45
Type of MiC: Steel
CFA/GFA: 1900 m2
Number of Floors: 2 office floor with Roof
Number of Units: 45
Main Contract Period: Sep 2019 - Mar 2020
MiC Part: Temporary Site Office
Other project feature:

Full scale of MiC temporary office that occupy relatively large CFA of 760 m2

Courtesy of China State Hailong

Tseung Kwan O Desalination Plant Temporary Site Office

Area 137 Fill Bank, Tseung Kwan O

Client: Water Supplies Department
Project Role:  Architectural / Structural Engineer / BS Engineer / MiC Module Designer
No. of Modules: 80
Type of MiC: Steel
CFA/GFA: 3600 m2
Number of Floors: 2 office floor with Roof
Number of Units: 80
Main Contract Period: Mar 2019 - Jul 2020
MiC Part: Temporary Site Office
Other project feature:

Full scale of MiC temporary office that occupy relatively large CFA of 1,200 m2

Courtesy of China State Hailong

Kindergarten in Futian District, Shenzhen

Futian District, Shenzhen

Client: Public Works Department of Futian District, Shenzhen
Project Role:  Structural Engineer / MiC Module Designer
No. of Modules: 390
Type of MiC: Steel
CFA/GFA: 22,110 m2/ 13,590 m2
Number of Floors: 3 floor of each block 
Number of Units: 45
Main Contract Period: Oct 2020 - Mar 2021
MiC Part:

Kindergarten in

  1. Maling Community  
  2. Xiamei Community  
  3. Xiangmi Lake
  4. Xinhua Community  
  5. Garden West          
  6. Cuiwan Community
  7. Fushan Community  
  8. Fu'an Community
Other project feature:
  • Innovative fast build mode, shorten the construction period compared with the traditional architecture of more than 50%
  • The factory is prefabricated and assembled in construction, which is environmentally friendly and reduces The impact of pollution
  • Moved, modified, and used in circles

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 09.09.2021 14:00:24

Adopting MiC to Build Light Public Housing (LPH) to Expedite Housing Supply

The Policy Address 2022 announced the construction of LPH. The LPH Scheme is led by the Architectural Services Department with the adoption of MiC. The Housing Bureau has selected eight sites in Tuen Mun, Yuen Long, Ma On Shan, Kai Tak, Ngau Tau Kok and Chai Wai, providing around 30,000 LPH units. The construction period takes only one to two years. Each units equipped with self-contained toilet and basic facilities such as water heater and air-con. The first batch of around 2,100 units will be completed in 2024-25 and the remaining units will be completed by phases in 2025-26 and 2026-27, so as to shorten the waiting time of public housing.

HOT TOPIC