The architectural practice of Spence Robinson originated in Shanghai in 1904, and prominent buildings designed there included the Shanghai post office and the race-course, which are still standing today. The firm moved to Hong Kong in 1947, and over the years has established an excellent reputation for the quality of its services. There are many projects throughout Hong Kong include public housing, railway stations, ferry terminal, residential and commercial developments, educational establishments, recreation clubs, industrial buildings, etc. Spence Spence Robinson Limited provides professional consultancy services in the disciplines of architecture, project management, interior design, and building surveying. The company aims to provide their clients with wide-ranging services of the highest standard, and they strive in all fields to be efficient yet creative, well-administered yet flexible. Robinson has the expertise in green building practice, heritage conservation, BIM and modular integrated construction. The reputation and recognition are growing steadily in these fields.
The practice is managed by three Directors, all having many years of experience in Architecture. Their resources consist of 3 nos. Authorised Persons, 8 nos. of Qualified Architects supported by a pool of technical staff.
Having practiced in architectural field in Hong Kong for more than 70 years, Spence Robinson Limited has received appreciations from many clients. Spence Robinson Limited is on the consultant list of LCSD, AMO, HKSC, ArchSD, HKHA, HAD, URA, BD, EMSD, Hospital Authority, Airport Authority and Works Bureau (Government Sector/Quasi-government Corporation); CUHK, EdUHK, HKU, HKPU and HKBU (University and Tertiary establishments) and Caritas HK, Diocesan HK, TWGH and Po Leung Kuk (Non-governmental organisation) and many private organisations.
Quality and care are deep rooted in their practice. The company is currently implementing and practicing ISO 9001:2015. Staff is the company's asset. They provide assistance to their staff to become specialised through knowledge transfer and skill training.
Signature Projects
Modular Social Housing Scheme
Client: |
The Lok Sin Tong Benevolent Society, Kowloon |
Project Role: |
AP/ Lead consultant |
No. of MiC Modules: |
108 |
CFA/GFA: |
2858 / 2562 m2 |
No. of Floors: |
3 |
No. of Units: |
110 |
Main Contract Period: |
8 months |
MiC Part: |
108 nos. of residential units |
Other Project Features: |
A transitional housing community designed with 108 nos. of MIC units and 2 nos. of in-situ accessible units. Considering the restricted site area, ease of construction, sequence of installation and costs, the module size was designed as 3.1m x 5.5m. The factory production of the MIC units runs in parallel with the in-situ works such as corridor, staircase and plant rooms on site to fast track overall construction time. Using enclosed kitchen instead of open kitchen and keeping the building under 4 storeys, the fire services installation could be greatly simplified in accordance to the fire code. It also resulted in costs and construction time benefits while bringing better convenience to tenants as well as improving living standard. The steel MIC modules were designed for easy dismantle, facilitating transportation and re-usable considerations. |
Ma On Shan MiC Transitional Housing
Client: |
Non-governmental Organisation |
Project Role: |
Design Consultant |
No. of MiC Modules: |
426 |
CFA/GFA: |
10,100 / 9,500 m2 |
No. of Floors: |
4 |
No. of Units: |
391 |
MiC Part: |
387 nos. of residential units |
Kai Tak MiC Transitional Housing
Client: |
Non-governmental Organisation |
Project Role: |
Design Consultant |
No. of MiC Modules: |
430 |
CFA/GFA: |
10,300 / 9,000 m2 |
No. of Floors: |
4 |
No. of Units: |
336 |
MiC Part: |
332 nos. of residential units |
Choi Hung MiC Transitional Housing
Client: |
Non-governmental Organisation |
Project Role: |
Design Consultant |
No. of MiC Modules: |
202 |
CFA/GFA: |
4,800 / 4,500 m2 |
No. of Floors: |
4 |
No. of Units: |
166 |
MiC Part: |
164 nos. of residential units |
Chaiwan Ambulance Depot & Departmental Quarters
Client: |
Architectural Services Department |
Project Role: |
Design Consultant |
No. of MiC Modules: |
1,350 |
CFA/GFA: |
24,200 / 21,290 m2 |
No. of Floors: |
31 |
No. of Units: |
270 |
MiC Part: |
Residential units above podium |
Other Project Features: |
High-rise residential buildings with ambulance depot and associated facilities at podium level |
MiC Transitional Housing
Client: | Pok Oi Hospital | |||||||||||||||||||||||||||||
Project Role: | Design Consultant for Design and Build Contractor | |||||||||||||||||||||||||||||
No. of MiC Modules: | 2,048 | |||||||||||||||||||||||||||||
CFA/GFA: | 62,050 / 60,355 m2 | |||||||||||||||||||||||||||||
No. of Floors: | 4 | |||||||||||||||||||||||||||||
No. of Units: | 1,998 | |||||||||||||||||||||||||||||
Main Contract Period: | 2 years ( commencing March 2021 ) | |||||||||||||||||||||||||||||
MiC Part: | Residential units |
Residential Care Homes for the Elderly ("RCHE") in Kwu Tung North
Client: |
Architectural Services Department |
Project Role: |
Factory Inspection Services |
No. of MiC Modules: |
1,764 |
CFA/GFA: |
44,200 / 40,800 m2 |
No. of Floors: |
8 |
No. of Units: |
294 |
Other Project Features: |
A Multi-Welfare Services Complex with 7 nos. of 250-place Residential Care Home for the Elderly, 2 nos. of Day Care Units, a 40-place Care & Attention Home for Sererely Disabled Persons, a 50-place Day Activity Centre and a 50-place Hostel for Severely Handicapped Persons. |
Primary School at Tai Po
Client: |
Architectural Services Department |
Project Role: |
Design Consultant for Design and Build Contractor |
No. of MiC Modules: |
175 |
CFA/GFA: |
13,130 / 12,400 m2 |
No. of Floors: |
7 |
No. of Units: |
43 |
Main Contract Period: |
26 months ( Commence in May 2021 ) |
MiC Part: |
36 nos. of classrooms; 6 groups of toilets; pantry |
Other Project Features: |
A 36-classroom Primary school comprising a 7-storeys classroom block with an assembly hall and associated facilities. |
MiC Service Apartment
Client: |
SRV Limited |
Project Role: |
Design Consultant |
No. of MiC Modules: |
48 |
CFA/GFA: |
1,100/1,000 m2 |
No. of Floors: |
3 |
No. of Units: |
48 |
Main Contract Period: |
9 months |
MiC Part: |
All residential units |