Guangdong CIMC Building Construction Company Limited

Jiangmen, Guangdong Province, China

Founded in 2004, CIMC MBS has built up a portfolio of Hotel and Hospitality, Student Accommodation, Apartment and workforce accommodation for Global clients. With over 4 manufacturing facilities and 5 regional branches over UK, Australia and USA, CIMC MBS has been the leading modular building provider in the world. CIMC MBS has designed the V system, T system and Flat Pack for its steel structure modular buildings. All of the factories have substantial experience in producing modular buildings and are equipped for fabrication, quality assurance and HSE. Today, CIMC’s factory is able to deliver over 8,000 modules annually.  

Key Features

Courtesy of CIMC

V System


The V System offers a competitive alternative to traditional construction methods. It is a system perfectly suitable for Hotels, Student Accommodation, and Apartments.

Courtesy of CIMC

T System


T system is designed and engineered to provide rural area accommodation solutions for Resource and Energy Industry. It is able to supply a comprehensive range of temporary and permanent building solutions, from single storey to two storey, in layouts of Mining Camp, Workforce Accommodation and Oil Gas Camp.

Courtesy of CIMC

Flat Pack


This type of product can be used as temporary office, accommodation, sanatory and dining room etc..

Signature Projects

Courtesy of CIMC

Unilodge Darwin Casuarina Student Accommodation

Darwin, Australia

Client:

GPT/Unilodge (for Charles Darwin University students)

Project Role:

MiC Supplier

Number of Floors:

7

Number of Modules:

167

Number of Bedrooms:

303 comprising of 1 bed studio suites, 2 & 4 bed apartments

Completion:

2014

MiC Parts:

Factory fitted external cladding and roof structure. Internal fixtures and fittings full finished and furnishings packed in rooms ready for final commissioning.
Internal mechanical, electrical and hydraulic fully commissioned in factory ready for connection and final commissioning on site.

Courtesy of CIMC

Hampton by Hilton Hotel Bristol Airport

North Side Road, Bristol International Airport, Bristol, UK

Clients:

Bristol Airport

Project Role:

MiC Supplier

Number of Floors:

4

Number of Modules:

117

Number of Bedrooms:

201

Project Period:

2014 - 2016

MiC Parts:

All the modules were 100% internally completed with decoration, furniture and all fittings in the factory.

Courtesy of CIMC

Park View Student Village of Newcastle University

Richardson Rd, Newcastle City

Clients:

Galliford Try

Project Role:

MiC Supplier

Number of Floors:

6 blocks with 4 - 9 floors in different

Number of Modules:

789

Number of Bedrooms:

1, 243

Project Period:

2016 - 2018

MiC Parts:

Modules function with standard room, accessible rooms, kitchen and living rooms.

 

 

PROJECT DETAILS

Courtesy of CIMC

Holiday Inn Express London - ExCeL

1018 Dockside Road, London, UK

Clients:

Bricks Capital

 Project Role:

MiC Supplier

Number of Floors:

4

Number of Modules:

126

Number of Bedrooms:

204

Project Period:

June 2015

MiC Parts:

All three upper floors, the linen rooms, stair and lift cores and all circulation spaces are entirely comprised of volumetric building modules.

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 19.12.2022 15:32:56

Adopting MiC to Build Light Public Housing (LPH) to Expedite Housing Supply

The Policy Address 2022 announced the construction of LPH. The LPH Scheme is led by the Architectural Services Department with the adoption of MiC. The Housing Bureau has selected eight sites in Tuen Mun, Yuen Long, Ma On Shan, Kai Tak, Ngau Tau Kok and Chai Wai, providing around 30,000 LPH units. The construction period takes only one to two years. Each units equipped with self-contained toilet and basic facilities such as water heater and air-con. The first batch of around 2,100 units will be completed in 2024-25 and the remaining units will be completed by phases in 2025-26 and 2026-27, so as to shorten the waiting time of public housing.

HOT TOPIC