Tak Sing Engineering (Hong Kong) Limited

Tak Sing Engineering (Hong Kong) Ltd. (Tak Sing) has been incorporated in Hong Kong since 2012, and actively involved in the construction activities of local construction industry in areas specializing in A&A works, repairing and maintenance works, and renovation works as well, for different types of Clients by rendering professional and well managed construction services.

 

In 2018, the Company started to apply to the Buildings Department for registration as a “Registered General Building Contractor” pursuant to the Buildings Ordinance and was approved by the Buildings Department.

 

Meanwhile, the Company has also implemented an “Integrated Management System” comprising the Quality Management System (ISO 9001:2015), Environmental Management System (ISO 14001:2015) and Occupational Health & Safety Management System (OHSAS 18001:2007) which were certified by the Certification Body in 2019.  Tak Sing trusts that the certification of our “Integrated Management System” will give more confidence to the Clients on our professional and well managed construction services rendered.

 

The business of the company is expanding, and will hire more experienced project management personnel and logistics support personnel, so as to provide more professional services in engineering projects to meet the various requirements of diversified clients.

Signature Projects

Courtesy of Lok Sin Tong

Lok Sin Tong Social Housing Scheme

Junction of Sung Wong Toi Road and To Kwa Wan Road, Kowloon

Client: The Lok Sin Tong Benevolent Society, Kowloon
Project Role: Main Contrator
No. of MiC Modules: 108
CFA/ GFA: CFA:2,858m²/ GFA:2,555m² 
No. of Floors: 3
No. of Units: 110
Main Contract Period: 7 June 2020 - 15 Mar 2021
MiC Part: 108 Units, Steel MIC Units, 5.56m long x 3.10m wide x 3.05m high / Each
Other Project Highlights:
  1. Cost effective since modules can be reused for many times 
  2. Environmental friendly  and reduce the construction wastage 
  3. Save time & cost for internal fitting-out or renovation since all the interiors can be properly fixed and installed                           
  4. Noise and Dust Abatement

 

PROJECT DETAILS

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 26.01.2021 15:56:52

Adopting MiC to Build Light Public Housing (LPH) to Expedite Housing Supply

The Policy Address 2022 announced the construction of LPH. The LPH Scheme is led by the Architectural Services Department with the adoption of MiC. The Housing Bureau has selected eight sites in Tuen Mun, Yuen Long, Ma On Shan, Kai Tak, Ngau Tau Kok and Chai Wai, providing around 30,000 LPH units. The construction period takes only one to two years. Each units equipped with self-contained toilet and basic facilities such as water heater and air-con. The first batch of around 2,100 units will be completed in 2024-25 and the remaining units will be completed by phases in 2025-26 and 2026-27, so as to shorten the waiting time of public housing.

HOT TOPIC