Techoy Construction Company Limited

Techoy Construction Company Limited (Techoy) is an energetic team of diverse talents with a spirit of strong commitment to clients. With its forward thinking, technical competent person in construction engineering and management coupled with the Building Information Modelling, Modular Integrated Construction, Design for Manufactory Assembly, Techoy takes collaborative approach to offer reliable, quality, cost and time efficient services.

 

Address:  2/F, Centre 600, 82 King Lam Street, Lai Chi Kok, Kowloon
Tel: (852) 2529 9333

Key Features

Courtesy of Techoy

Building Information Modelling (BIM)


Techoy is committed to drive all our projects with BIM. By utilizing BIM tools, its BIM team will build the project in the virtual world while our professional project team will perform once again in the real world. The wide adaptation of BIM within the company is to optimize construction sequence, increase certainty, minimize design risks, reduce unnecessary wastage, and improve productivity and quality, so as to exceed our clients’ expectations.

Courtesy of Techoy

3D Scanning and Printing


Coupling with BIM, we utilise 3D scanning and printing technologies in our projects. We utilise 3D printing technology where appropriate throughout the project cycle to ensure effective communications with consultants and client representative, while we utilize 3D scanning in revitalisation projects to facility better planning of works and other projects in accordance with client’s requirement to provide client as-built models for future facility management purpose.

Electronic Monitoring System


Techoy adopts electronic monitoring system in our projects where not only management staff could track site progress in real time, but also allowing client’s representative and consultants to do the same.

Signature Projects

Courtesy of Techoy Construction

Transitional Residential Development

Nos. 456 - 458, 464 - 466 Sai Yeung Choi Street North

Client:  Henderson Land Development Company Limited
Project Role Main Contractor 
No. of Module
CFA/GFA: 17 m² each
Project Period upon Completion:  1 year
MiC Parts: Whole MiC Module
Courtesy of Techoy Construction

Transitional Residential Development

Nos.5-6 Yiu Tung Street

Client:  Henderson Land Development Company Limited
Project Role: Main Contractor 
CFA/GFA: 33 m2
Project Period:  1 year
MiC Parts: Whole MiC Module
Courtesy of Techoy Construction

Transitional Residential Development

Nos.21-27 Berwick Street

Client:  Henderson Land Development Company Limited
Project Role: Main Contractor 
CFA/GFA: 33 m2
Project Period:  1 year
MiC Parts: Whole MiC Module
Courtesy of Techoy Construction

Nam Cheong 220

202-220 Nam Cheong Street, Kowloon

Client: The Hong Kong Council of Social Service
Project Role: Main Contractor 
No. of Modules:
68
CFA/GFA: 2, 052 m2
Number of Floors:  4
Number of Units: 89
Project Period:  1.5 year
MiC Parts: Whole MiC Module

 

PROJECT DETAILS

Airport Authority Office Tower


Client:  Hong Kong Airport Authority
Project Role: Main Contractor 
No. of Modules:
6
CFA/GFA: 2, 545 m2
Number of Floors:  2
Number of Units: 4
Courtesy of Techoy Construction

Play Facilities

Fung Mat Road Waterfront Open Space, Central and Western District

Client:  Home Affairs Department
Project Role: Main Contractor 
No. of Modules:
4
CFA/GFA: 725 - 1, 121 m2
Number of Floors:  1
Number of Units: 4
Project Period:  2 months
MiC Parts: Whole MiC Module

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 31.12.2020 14:56:43

Adopting MiC to Build Light Public Housing (LPH) to Expedite Housing Supply

The Policy Address 2022 announced the construction of LPH. The LPH Scheme is led by the Architectural Services Department with the adoption of MiC. The Housing Bureau has selected eight sites in Tuen Mun, Yuen Long, Ma On Shan, Kai Tak, Ngau Tau Kok and Chai Wai, providing around 30,000 LPH units. The construction period takes only one to two years. Each units equipped with self-contained toilet and basic facilities such as water heater and air-con. The first batch of around 2,100 units will be completed in 2024-25 and the remaining units will be completed by phases in 2025-26 and 2026-27, so as to shorten the waiting time of public housing.