Hip Hing Construction Company Limited

Since being established in 1961 Hip Hing Construction Co., Ltd. ("Hip Hing") has grown to become one of the leading contractors in Hong Kong. During this time Hip Hing has been trusted by our clients to construct many of the landmark buildings which define Hong Kong. The construction services provided by Hip Hing Construction Group have contributed to the development of Hong Kong and its economy and have helped to shape a better living environment for the people of Hong Kong.

 

Address:    11/F Chevalier Commercial Centre, No 8 Wang Hoi Road, Kowloon Bay, Kowloon, Hong Kong
Tel: (852) 2525 9251 

Key Features

Courtesy of Hip Hing


To help the construction industry cope with the difficulties of labour shortages, escalating construction costs, demanding programmes and quality assurance, Hip Hing has been keeping pace with the latest trends and adopting Modular Integrated Construction (MiC). Three of its recent projects, InnoCell for Hong Kong Science and Technology Parks and Hong Kong Government’s anti-epidemic quarantine facilities at Penny's Bay and Pat Heung have used MiC. 

Courtesy of Hip Hing


At Hip Hing, Building Information Modelling (BIM) is at the core of our operations. It is used to foster connectivity and collaboration, and ultimately to enhance the safety, productivity and sustainability of our operations and the AECO industry. We adopt the OpenBIM concept, as part of our strategy to unify the workflow of all project team members, from design through fabrication to construction. The well-managed common data environment, makes information accessible to all, facilitates interaction and communication, thus enabling informed decision making by connecting and  synchronizing all parties in the value chain.

Signature Projects

Courtesy of Hip Hing

InnoCell at Hong Kong Science Park

TPTL 245, Pak Shek Kok, Tai Po, New Territories (Science Park)

Client: Hong Kong Science and Technology Parks Corporation
Project Role Main Contractor
No. of Modules: 418
GFA: 15, 300 m²
Number of Floors: 18
Number of Units: 418
Project Period: Aug 2019 - Dec 2020
MiC Parts: Residential Units
Other Project Features:
  • First high-rise steel MiC permanent building in Hong Kong
  • Over 70% of concrete structures are modularised on typical floors
  • Full BIM collaboration, clashes resolved 2 storeys ahead of concreting, and 18 weeks before E&M first fixing
  • Harmful air particles and noise reduced by 70%
  • Water and material wastage reduced by 30%
  • Paper free documentation saves more than 180,000 sheets
  • Ahead of conventional construction programme by more than 6 months
  • 600,000 man-hours accident free in construction phase

 

PROJECT DETAILS

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 31.12.2020 14:56:45

HKICC and Quarantine Camps

To fight COVID-19, the HKSAR Government has built the North Lantau Hospital Hong Kong Infection Control Centre (HKICC) next to the AsiaWorld-Expo providing 136 negative pressure wards which were designed with reference to the standards of tier-1 isolation wards that could accommodate 816 beds. The HKICC adopted MiC method and was completed in merely 4 months (Sep 2020 – Jan 2021). It will open on 26 February 2021.

From blueprint to scale

05.03.2021 Hospital Authority

Infection control centre to open

25.02.2021 HKSAR Government

Temporary hospital completed

20.01.2021 HKSAR Government

Penny's Bay Quarantine Camp Phase 4

07.01.2021 AluHouse

同心抗疫: 鯉魚門檢疫單位投入運作 (Chinese only)

03.03.2020 Information Services Centre

HOT TOPIC