MECS Consulting Engineers

MECS Consulting Engineers was established by Dr. Paul P.M. Li in 1979.  In the past 42 years, it has completed more than 400 projects of a wide range of type and complexity.  Its clients include most major developers, institutions and special groups.

 

The Managing Partner – Dr. Paul P.M. Li has 42 years in building service engineering. He is a chartered electrical and building services engineer over 40 years of experience.

 

MECS is committed to provide high quality, initiative & cost-effective design. 

 

The company provides full and comprehensive services from conceptual design, site survey, budget estimation and preliminary design developing to detail design and working drawing, to completion of the project.

Signature Projects

Courtesy of HKCSS

Nam Cheong 220

202 - 220 Nam Cheong Street, Sham Shui Po

Client: The Hong Kong Council of Social Service
Project Role: BS Engineer
GFA: 2,052 m2
Number of Floors: 4
No. of Modules: 68
Number of Units: 89
Type of Modules: Steel

 

 

PROJECT DETAILS

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 23.03.2021 14:31:36

Adopting MiC to Build Light Public Housing (LPH) to Expedite Housing Supply

The Policy Address 2022 announced the construction of LPH. The LPH Scheme is led by the Architectural Services Department with the adoption of MiC. The Housing Bureau has selected eight sites in Tuen Mun, Yuen Long, Ma On Shan, Kai Tak, Ngau Tau Kok and Chai Wai, providing around 30,000 LPH units. The construction period takes only one to two years. Each units equipped with self-contained toilet and basic facilities such as water heater and air-con. The first batch of around 2,100 units will be completed in 2024-25 and the remaining units will be completed by phases in 2025-26 and 2026-27, so as to shorten the waiting time of public housing.

HOT TOPIC