Orientfunds Precast Limited

Orientfunds Precast Limited (OPL) established in 1998 and located at Sha Tian Town of Dongguan City. The size of the factory is over 80,000 m². We run as a sole enterprise. A natural water conditions adjacent to the factory allows sea transportation. The factory is 100 km from Hong Kong and is located at Shi Zi Yang of Pearl River. It takes approx. 6 hours to Hong Kong by sea or 2 hours on land through Huanggang or Man Kam To.

Key Features

Courtesy of OPL


Provide Service in Design, Supply and Delivery of Precast Concrete Units both Civil & Building Construction and obtained ISO 9001 and 14001.

Courtesy of OPL


Going to develop MiC Products and obtained the "In-principle Acceptance"(Acceptance Reference No. MiC 3/2020) from the Buildings Department.

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 04.10.2024 10:08:08

Adopting MiC to Build Light Public Housing (LPH) to Expedite Housing Supply

The Policy Address 2022 announced the construction of LPH. The LPH Scheme is led by the Architectural Services Department with the adoption of MiC. The Housing Bureau has selected eight sites in Tuen Mun, Yuen Long, Ma On Shan, Kai Tak, Ngau Tau Kok and Chai Wai, providing around 30,000 LPH units. The construction period takes only one to two years. Each units equipped with self-contained toilet and basic facilities such as water heater and air-con. The first batch of around 2,100 units will be completed in 2024-25 and the remaining units will be completed by phases in 2025-26 and 2026-27, so as to shorten the waiting time of public housing.

HOT TOPIC