CR Construction Company Limited

CR Construction Company Limited, an indirect wholly-owned subsidiary of CR Construction Group Holdings Limited, was established in 1967 carrying out construction business. Over the years, CR Constrcution accumulated considerable experience in the local market and established a reputation of a reliable building contractor for quality and complex projects.

 

In January 2014, Zhejiang Construction Investment Group Co. Ltd. acquired CR Construction and became its ultimate parent company. In October 2019, CR Construction Group Holdings Limited was listed on the Main Board of the Stock Exchange of Hong Kong.

 

Some of the major projects of CR Construction include proposed residential development at Kwun Tong Town Centre (Areas 2 & 3), proposed hotel development at TCTL38 Tung Chung, comprehensive renovation for Beverly Hill at 6 Broadwood Road Happy Valley, residential development at Lung Kui Road Beacon Hill, residential development at Borrett Road, Pak Tin Estate Phase 9redevelopment, The St. Regis Hong Kong at Wan Chai, One Hennessy at Wanchai, China Unicom (Hong Kong) Global Center at Tseung Kwan O, redevelopment of Ying Wa Girls’ School, and Chu Hai College of Higher Education at Tuen Mun etc.

 

Address:    Level 32, Standard Chartered Tower of Millennium City 1 No.388 Kwun Tong Road, Kowloon, Hong Kong
Tel: (852) 2828 1515

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 04.12.2023 14:08:40

Adopting MiC to Build Light Public Housing (LPH) to Expedite Housing Supply

The Policy Address 2022 announced the construction of LPH. The LPH Scheme is led by the Architectural Services Department with the adoption of MiC. The Housing Bureau has selected eight sites in Tuen Mun, Yuen Long, Ma On Shan, Kai Tak, Ngau Tau Kok and Chai Wai, providing around 30,000 LPH units. The construction period takes only one to two years. Each units equipped with self-contained toilet and basic facilities such as water heater and air-con. The first batch of around 2,100 units will be completed in 2024-25 and the remaining units will be completed by phases in 2025-26 and 2026-27, so as to shorten the waiting time of public housing.

HOT TOPIC