BROAD Sustainable Built Technology Co. Ltd. (BSB), which is under Broad Group has 11 years of experience in prefabricated buildings. It has successively built more than 60 buildings with steel-structures and stainless steel. With mature prefabrication system and a very high factory rate, the construction videos had amazed the world with on-site installation of 3 floors a day, 57 floors in 19 days etc..
In 2009, Being plagued by the Wenchuan earthquake and climate change deterioration, BSB determined to develop the factory-made super energy-efficient steel structure buildings. From the very beginning, BSB has formulated 6 standards of sustainable building development: magnitude 9 earthquake resistance, 5 times more energy efficiency, 10 times longer lifespan, 100 times cleaner air, 100% steel structure, only 1% construction waste. 58 buildings of various types were successively built, all have met the above-mentioned 6 standards of sustainable buildings, and have widely received praise and recognition.
Since the outbreak of Covid19, Broad Group has launched a series of anti-epidemic products such as Ozone Disinfection Cabin and electrostatic virus decontamination machines. At the same time, it has provided more than 600 electrostatic purifier with powerful disinfection and sterilization functions for more than 50 hospitals around the world, such as “Huoshenshan” Hospital, Leishenshan Hospital and Fangcang Hospital in Wuhan. It has also donated more than 5,000 mobile lung protectors to medical personnel, traffic police, sanitation workers and other people who work on the front line in order to make contribution in anti-epidemic. Broad Group even made its first time to export modules to assist with South Korea to build an isolation hospital, for the project detail, please refer to “Overseas Significant Project” on this website.
Signature Projects
BROAD Town (Hunan)
Dormitory (prototype) built in 1 day - BROAD Town (Hunan).
BROAD Pavilion at World Expo
BROAD Pavilion at World Expo built in 1 day in Shanghai.
COP16 Pavilion
COP16 Pavilion built in 1 day in Mexico.
Multi-function building
Multi-function building built in 3 days in Shanxi.
Company HQ
Company HQ built in 4 days in Shandong.
Residential apartment
Residential apartment built in 3 days in Hubei.
Office building
Office building built in 9 days in Ningxia.
Business Innovation Center
Business Innovation Center built in 3 days in Fujian.
Urban complex
Urban complex built in 19 days in Hunan.
Hotel
Hotel built in 8 days in Hunan.
Hotel
Hotel built in 7 days (the 58th building) in Shanxi.