BROAD Sustainable Built Technology Company Limited

Shanghai, China

BROAD Sustainable Built Technology Co. Ltd. (BSB), which is under Broad Group has 11 years of experience in prefabricated buildings. It has successively built more than 60 buildings with steel-structures and stainless steel. With mature prefabrication system and a very high factory rate, the construction videos had amazed the world with on-site installation of 3 floors a day, 57 floors in 19 days etc..

 

In 2009, Being plagued by the Wenchuan earthquake and climate change deterioration, BSB determined to develop the factory-made super energy-efficient steel structure buildings. From the very beginning, BSB has formulated 6 standards of sustainable building development: magnitude 9 earthquake resistance, 5 times more energy efficiency, 10 times longer lifespan, 100 times cleaner air, 100% steel structure, only 1% construction waste. 58 buildings of various types were successively built, all have met the above-mentioned 6 standards of sustainable buildings, and have widely received praise and recognition.

 

Since the outbreak of Covid19, Broad Group has launched a series of anti-epidemic products such as Ozone Disinfection Cabin and electrostatic virus decontamination machines. At the same time, it has provided more than 600 electrostatic purifier with powerful disinfection and sterilization functions for more than 50 hospitals around the world, such as “Huoshenshan” Hospital, Leishenshan Hospital and Fangcang Hospital in Wuhan. It has also donated more than 5,000 mobile lung protectors to medical personnel, traffic police, sanitation workers and other people who work on the front line in order to make contribution in anti-epidemic. Broad Group even made its first time to export modules to assist with South Korea to build an isolation hospital, for the project detail, please refer to “Overseas Significant Project” on this website.

Signature Projects

Courtesy of BSB

BROAD Town (Hunan)

Hunan, China

Dormitory (prototype) built in 1 day - BROAD Town (Hunan).

Courtesy of BSB

BROAD Pavilion at World Expo

Shanghai, China

BROAD Pavilion at World Expo built in 1 day in Shanghai.

Courtesy of BSB

COP16 Pavilion

Mexico

COP16 Pavilion built in 1 day in Mexico.

Courtesy of BSB

Multi-function building

Shanxi, China

Multi-function building built in 3 days in Shanxi.

Courtesy of BSB

Company HQ

Shandong, China

Company HQ built in 4 days in Shandong.

Courtesy of BSB

Residential apartment

Hubei, China

Residential apartment built in 3 days in Hubei.

Courtesy of BSB

Office building

Ningxia, China

Office building built in 9 days in Ningxia.

Courtesy of BSB

Business Innovation Center

Fujian, China

Business Innovation Center built in 3 days in Fujian.

Courtesy of BSB

Urban complex

Hunan, China

Urban complex built in 19 days in Hunan.

Courtesy of BSB

Hotel

Hunan, China

Hotel built in 8 days in Hunan.

Courtesy of BSB

Hotel

Shanxi, China

Hotel built in 7 days (the 58th building) in Shanxi.

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 31.12.2020 14:57:10

Adopting MiC to Build Light Public Housing (LPH) to Expedite Housing Supply

The Policy Address 2022 announced the construction of LPH. The LPH Scheme is led by the Architectural Services Department with the adoption of MiC. The Housing Bureau has selected eight sites in Tuen Mun, Yuen Long, Ma On Shan, Kai Tak, Ngau Tau Kok and Chai Wai, providing around 30,000 LPH units. The construction period takes only one to two years. Each units equipped with self-contained toilet and basic facilities such as water heater and air-con. The first batch of around 2,100 units will be completed in 2024-25 and the remaining units will be completed by phases in 2025-26 and 2026-27, so as to shorten the waiting time of public housing.

HOT TOPIC