Decenton Construction Company Limited specializes in the field of Modular Integrated Construction (MIC), offering a full-chain service from design and production to construction. Established in 2025 and headquartered in Hong Kong, the company operates a production base located in the Eastern Industrial Park of Songshan Lake, Dongguan, covering an area of 140 acres. Adopting a factory prefabrication and on-site assembly model, it covers building types such as residential, commercial, and public facilities, with advantages including rapid delivery, environmental sustainability, energy efficiency, and controllable costs. The company provides integrated "design-production-construction" solutions for high-rise buildings, temporary structures, medical and educational facilities, and more. Committed to advancing the industrialisation of construction, it is well-suited for urban renewal, emergency projects, and standardized residential developments.
Key Features
The shear wall is arranged at the peripheral position of the building plane, and the shear wall components are connected through a new of close-fitting joints, achieving a new type of beamless structure system with external frame shear wall large-span composite floor.
The main structure is made of hot-rolled section steel frames with full-bolted connections, combined with prefabricated composite slabs and detachable steeluss slab bearing plates; both internal and external walls are made of new lightweight wall panels; the prefabricated roof is composed of light steel trusses OSB substrate waterproof and insulation materials synthetic resin tiles; the water, electricity, heating, ventilation, sanitation, and decoration works are integrated.
Post-tensioned system is adopted, which is composed of prefabricated column, composite beams with holes and prestressed hollow slab. The system achieves dry construction of beam-column joints through prestress, breaks through the limitations of traditional cast-in-place joints, and significantly improves the construction efficiency.
Signature Projects
Hong Kong Hung Lok Road transitional housing

Client: | The Society of Rehabilitation and Crime Prevention, Hong Kong |
Project Role: | MiC supplier |
No. of MiC Modules: | 238 |
No. of Floors: | 4 |
No. of Units: | 491 |
Main Contract Period: | 2023-2024 |
Other Project Features: |
The project consists of two four-story composite buildings, providing a total of 491 residential units, accommodating about 1,090 residents. Each is equipped with an independent washroom and open-style kitchen. |
Adopting MiC to Build Light Public Housing (LPH) to Expedite Housing Supply