Decenton Construction Company Limited

Decenton Construction Company Limited specializes in the field of Modular Integrated Construction (MIC), offering a full-chain service from design and production to construction. Established in 2025 and headquartered in Hong Kong, the company operates a production base located in the Eastern Industrial Park of Songshan Lake, Dongguan, covering an area of 140 acres. Adopting a factory prefabrication and on-site assembly model, it covers building types such as residential, commercial, and public facilities, with advantages including rapid delivery, environmental sustainability, energy efficiency, and controllable costs. The company provides integrated "design-production-construction" solutions for high-rise buildings, temporary structures, medical and educational facilities, and more. Committed to advancing the industrialisation of construction, it is well-suited for urban renewal, emergency projects, and standardized residential developments.

Key Features


The shear wall is arranged at the peripheral position of the building plane, and the shear wall components are connected through a new of close-fitting joints, achieving a new type of beamless structure system with external frame shear wall  large-span composite floor. 


 The main structure is made of hot-rolled section steel frames with full-bolted connections, combined with prefabricated composite slabs and detachable steeluss slab bearing plates; both internal and external walls are made of new lightweight wall panels; the prefabricated roof is composed of light steel trusses   OSB substrate waterproof and insulation materials   synthetic resin tiles; the water, electricity, heating, ventilation, sanitation, and decoration works are integrated. 


Post-tensioned system is adopted, which is composed of prefabricated column, composite beams with holes and prestressed hollow slab. The system achieves dry construction of beam-column joints through prestress, breaks through the limitations of traditional cast-in-place joints, and significantly improves the construction efficiency.

Signature Projects

Courtesy of Decenton Construction Company Limited

Hong Kong Hung Lok Road transitional housing

9 Hung Lok Road, Hung Hom, Hong Kong

Client: The Society of Rehabilitation and Crime Prevention, Hong Kong
Project Role: MiC supplier
No. of MiC Modules: 238
No. of Floors: 4
No. of Units: 491
Main Contract Period: 2023-2024
Other Project Features:

The project consists of two four-story composite buildings, providing a total of 491 residential units, accommodating about 1,090 residents. Each is equipped with an independent washroom and open-style kitchen.

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 28.07.2025 13:51:45

Adopting MiC to Build Light Public Housing (LPH) to Expedite Housing Supply

The Policy Address 2022 announced the construction of LPH. The LPH Scheme is led by the Architectural Services Department with the adoption of MiC. The Housing Bureau has selected eight sites in Tuen Mun, Yuen Long, Ma On Shan, Kai Tak, Ngau Tau Kok and Chai Wai, providing around 30,000 LPH units. The construction period takes only one to two years. Each units equipped with self-contained toilet and basic facilities such as water heater and air-con. The first batch of around 2,100 units will be completed in 2024-25 and the remaining units will be completed by phases in 2025-26 and 2026-27, so as to shorten the waiting time of public housing.