GMC Grand-Bay Intelligent Manufacturing and Technology Company Limited

GMC Grand-Bay Intelligent Manufacturing and Technology Company Limited is a professional company under the Guangzhou Municipal Construction Group (a "Fortune 500" company). The company specializes in providing comprehensive solutions for modular building, including design, product development, smart manufacturing, installation, and operation and maintenance.

 

The company has gained recognition as a national-level modular building industry base, Guangdong Provincial Modular Building Industry Base, and National High-Tech Enterprise. Bay Area Construction Technology focuses on research in "standardization, digitalization,modularity, informatization, and intelligence" and has developed a unique modular building system technology.

 

The company produces various prefabricated components, including concrete beams, columns, flooring, walls, windows, and stairs, as well as customized products for integrated kitchens, bathrooms, MIC modules, city pipelines, and equipment pipelines.

Key Features

Courtesy of GMC Grand-Bay Intelligent Manufacturing and Technology


GMC Grand-Bay Intelligent Manufacturing and Technology Company Limited has unique modular building system technology that integrates "standardisation, digitalisation, modularity, informatisation, and intelligence".

 

  • Standardised design for customised solutions
  • Digital manufacturing with automated production lines and fixed-platform molds
  • Modular construction of prefabricated components
  • Informationized management for real-time monitoring and control
  • Intelligent applications and smart building control

Signature Projects

Courtesy of GMC Grand-Bay Intelligent Manufacturing and Technology

Tonkin Street Redevelopment Project

No. 24-38 Tonkin Street and No. 240-244 Fuk Wing Street, Hong Kong

Client: Chinachem Group
Project Role:
MiC Supplier
No. of Modules: 726
Type of Module:  Concrete
No. of units: 198
Number of Floors: 28

 

 

PROJECT DETAILS

 

OTHER PROJECT DETAILS

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 23.01.2025 10:23:41

Adopting MiC to Build Light Public Housing (LPH) to Expedite Housing Supply

The Policy Address 2022 announced the construction of LPH. The LPH Scheme is led by the Architectural Services Department with the adoption of MiC. The Housing Bureau has selected eight sites in Tuen Mun, Yuen Long, Ma On Shan, Kai Tak, Ngau Tau Kok and Chai Wai, providing around 30,000 LPH units. The construction period takes only one to two years. Each units equipped with self-contained toilet and basic facilities such as water heater and air-con. The first batch of around 2,100 units will be completed in 2024-25 and the remaining units will be completed by phases in 2025-26 and 2026-27, so as to shorten the waiting time of public housing.

HOT TOPIC