China Construction Integrated Science & Technology Company Limited

China Construction Integrated Science & Technology Co., Ltd. is a technology-based innovation enterprise focusing on the field of modular products under the China State Construction (CSCEC), a Fortune 500 company and the world's largest investment and construction group. Established in 2015, it is headquartered in Beijing. As the "industrial platform, technology platform, and intellectual platform" for the modular business of the CSCEC, the company deeply focuses on smart manufacturing methods, green building products, and low-carbon urban development. It is committed to promoting industrial transformation through modular construction methods, driving the iterative upgrading of modular products through technological innovation, becoming a leader in the modular industry, and contributing to social development.

Key Features

Courtesy of China Construction Integrated Science & Technology Co., Ltd.


Based on the technology chassis folding module technology, relying on design technology, low-carbon technology, integration technology and intelligent manufacturing technology, we have formed Jizhi technology system to create different types of products according to needs.

Courtesy of China Construction Integrated Science & Technology Co., Ltd.


One of the nation's most advanced intelligent manufacturing bases invested and constructed by China Construction Integrated Science & Technology Co., Ltd., the Shenshan Factory boasts an annual production capacity of 30,000 modular units. Equipped with state-of-the-art hardware such as intelligent robots, automation equipment, and flexible production lines, the factory integrates software systems including BIM, ERP, MES, and a Smart Construction Platform, encompassing the entire product lifecycle from R&D, design, sales, manufacturing, to installation. This enables large-scale customization and personalized production of steel structural modules.

Signature Projects

Courtesy of China Construction Integrated Science & Technology Co., Ltd.

Beijing Yizhuang Blue Collar Apartment project

Beijing, China

Project Role: MiC supplier
Types of Module: Steel
No. of MiC Modules: 1,504
CFA (m²): 120,000
No. of Floors: 9
Construction Time: 45 days
Other Project Features:
  • The tallest and largest modular building cluster in China's high-intensity seismic zone (Zone 8), showcasing exceptional resilience and structural integrity.
  • Designated as a AAA-level Ultra-High Assembly Rate Modular Demonstration Project in Beijing, embodying the city's commitment to innovation and sustainability.
  • Achieved an overall assembly rate of 92%, marking a significant milestone in the advancement of prefabricated construction technology and efficiency in China.

 

Courtesy of China Construction Integrated Science & Technology Co., Ltd.

Xiong'an Lvboyuan Yunjing Hotel

Hebei, China

Project Role: MiC supplier
Types of Module: Steel
No. of MiC Modules: 112
CFA (m²): 18,600
No. of Floors: 3
Construction Time: 150 days
Other Project Features:
  • China's first permanent modular star-rated hotel and the largest single-module curved building in China;
  • With a construction height of 16.8 meters, it achieves a historic breakthrough in China's modular building system;
  • It took 150 days to complete, setting a record for the fastest construction speed of a domestic star-rated modular hotel.

 

Courtesy of China Construction Integrated Science & Technology Co., Ltd.

Beijing Yijia New Youth Town

Beijing, China

Project Role: MiC supplier
Types of Module: Steel
No. of MiC Modules: 1,955
CFA (m²): 64,700
No. of Floors: 3
Construction Time: 100 days
Other Project Features:
  • Beijing's first eco-oriented apartment living park built on the principles of "green construction, smart construction, lean construction, and humanistic construction".
  • 2.95% of the project is modularized with an ultra-high assembly rate.

 

Courtesy of China Construction Integrated Science & Technology Co., Ltd.

Bright Moon and Clear Spring project

Shenzhen, China

Project Role: MiC supplier
Types of Module: Steel
No. of MiC Modules: 5
CFA (m²): 90
Construction Time: 14 days
Other Project Features:

It adopts the technical path of passive energy-saving design priority, active energy system optimization, and supplement of the optical storage, direct current, and soft power system, and is equipped with various smart devices such as optical storage, direct current, and soft power system, heat pump fresh air all-in-one machine, and air source heat pump water heater. It is built with a modular building structure, an integrated self-ventilating wooden roof, and prefabricated interior decoration.

 

Courtesy of China Construction Integrated Science & Technology Co., Ltd.

Three schools in the Economic Development Zone

Beijing, China

Project Role: MiC supplier
Types of Module: Steel
No. of MiC Modules: 846
CFA (m²): 29,800
Construction Time: 90 days
Other Project Features:

The seismic fortification intensity of buildings in Beijing is eight degrees. This "flash school" adopts seismic measures according to the nine-degree seismic fortification intensity, and the seismic grade of the building reaches Grade II, which is one grade higher than the national standard. The safety grade reaches Grade I, and the structural importance factor is the highest level.

Courtesy of China Construction Integrated Science & Technology Co., Ltd.

Shenzhen Taining Primary School

Shenzhen, China

Project Role: MiC supplier
Types of Module: Steel
No. of MiC Modules: 142
CFA (m²): 6,690
Construction Time: 90 days
Other Project Features:

Prefabricated demonstration project of education category of Shenzhen Housing and Construction Bureau.

Courtesy of China Construction Integrated Science & Technology Co., Ltd.

Headquarters base project of Meijin Hydrogen Energy

中國北京

Project Role: MiC supplier
Types of Module: Steel
CFA (m²): 36,000
Construction Time: Under Construction
Other Project Features:
  • The project introduces many advanced technologies such as ultra-low energy consumption distributed photovoltaic and ground source heat pump, and adopts a rapid construction method of prefabricated steel structure with an assembly rating of Grade A (BJ). It is an important attempt to vigorously develop ultra-low energy consumption buildings and promote the transformation of construction methods under the background of the national "dual carbon" strategy.
  • After completion, it will become the world's first optical hydrogen direct flexible building.

Contact Information:

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 26.09.2024 17:14:06

Adopting MiC to Build Light Public Housing (LPH) to Expedite Housing Supply

The Policy Address 2022 announced the construction of LPH. The LPH Scheme is led by the Architectural Services Department with the adoption of MiC. The Housing Bureau has selected eight sites in Tuen Mun, Yuen Long, Ma On Shan, Kai Tak, Ngau Tau Kok and Chai Wai, providing around 30,000 LPH units. The construction period takes only one to two years. Each units equipped with self-contained toilet and basic facilities such as water heater and air-con. The first batch of around 2,100 units will be completed in 2024-25 and the remaining units will be completed by phases in 2025-26 and 2026-27, so as to shorten the waiting time of public housing.

HOT TOPIC