China Construction Integrated Science & Technology Co., Ltd. is a technology-based innovation enterprise focusing on the field of modular products under the China State Construction (CSCEC), a Fortune 500 company and the world's largest investment and construction group. Established in 2015, it is headquartered in Beijing. As the "industrial platform, technology platform, and intellectual platform" for the modular business of the CSCEC, the company deeply focuses on smart manufacturing methods, green building products, and low-carbon urban development. It is committed to promoting industrial transformation through modular construction methods, driving the iterative upgrading of modular products through technological innovation, becoming a leader in the modular industry, and contributing to social development.
Key Features
Based on the technology chassis folding module technology, relying on design technology, low-carbon technology, integration technology and intelligent manufacturing technology, we have formed Jizhi technology system to create different types of products according to needs.
One of the nation's most advanced intelligent manufacturing bases invested and constructed by China Construction Integrated Science & Technology Co., Ltd., the Shenshan Factory boasts an annual production capacity of 30,000 modular units. Equipped with state-of-the-art hardware such as intelligent robots, automation equipment, and flexible production lines, the factory integrates software systems including BIM, ERP, MES, and a Smart Construction Platform, encompassing the entire product lifecycle from R&D, design, sales, manufacturing, to installation. This enables large-scale customization and personalized production of steel structural modules.
Signature Projects
Beijing Yizhuang Blue Collar Apartment project
Project Role: | MiC supplier |
Types of Module: | Steel |
No. of MiC Modules: | 1,504 |
CFA (m²): | 120,000 |
No. of Floors: | 9 |
Construction Time: | 45 days |
Other Project Features: |
|
Xiong'an Lvboyuan Yunjing Hotel
Project Role: | MiC supplier |
Types of Module: | Steel |
No. of MiC Modules: | 112 |
CFA (m²): | 18,600 |
No. of Floors: | 3 |
Construction Time: | 150 days |
Other Project Features: |
|
Beijing Yijia New Youth Town
Project Role: | MiC supplier |
Types of Module: | Steel |
No. of MiC Modules: | 1,955 |
CFA (m²): | 64,700 |
No. of Floors: | 3 |
Construction Time: | 100 days |
Other Project Features: |
|
Bright Moon and Clear Spring project
Project Role: | MiC supplier |
Types of Module: | Steel |
No. of MiC Modules: | 5 |
CFA (m²): | 90 |
Construction Time: | 14 days |
Other Project Features: |
It adopts the technical path of passive energy-saving design priority, active energy system optimization, and supplement of the optical storage, direct current, and soft power system, and is equipped with various smart devices such as optical storage, direct current, and soft power system, heat pump fresh air all-in-one machine, and air source heat pump water heater. It is built with a modular building structure, an integrated self-ventilating wooden roof, and prefabricated interior decoration.
|
Three schools in the Economic Development Zone
Project Role: | MiC supplier |
Types of Module: | Steel |
No. of MiC Modules: | 846 |
CFA (m²): | 29,800 |
Construction Time: | 90 days |
Other Project Features: |
The seismic fortification intensity of buildings in Beijing is eight degrees. This "flash school" adopts seismic measures according to the nine-degree seismic fortification intensity, and the seismic grade of the building reaches Grade II, which is one grade higher than the national standard. The safety grade reaches Grade I, and the structural importance factor is the highest level. |
Shenzhen Taining Primary School
Project Role: | MiC supplier |
Types of Module: | Steel |
No. of MiC Modules: | 142 |
CFA (m²): | 6,690 |
Construction Time: | 90 days |
Other Project Features: |
Prefabricated demonstration project of education category of Shenzhen Housing and Construction Bureau. |
Headquarters base project of Meijin Hydrogen Energy
Project Role: | MiC supplier |
Types of Module: | Steel |
CFA (m²): | 36,000 |
Construction Time: | Under Construction |
Other Project Features: |
|