Established in 2012, Matrix Living has more than 12 years of experience in modular construction and has become a leader in the domestic MIC industry. The total production area is 120,000 ㎡. Our factory is equipped with laser CNC automatic equipment, fully automatic plate production machines, keel machines, etc., realizing integrated production from steel structure to fitting-out; The technical center with more than 50 people the core department of Matrix Living, we can offer better service of in-depth design to clients.
Matrix Living has been focusing on the development of the modular industry. With its unique pioneering and innovative spirit, it has obtained Hong Kong HOKLAS welding certification, Hong Kong IPA certification, German TUV certification, American NTA certification, EU CPR building system certification and ISO9001 quality system certification.
In the last ten years, Matrix Living has successfully provided tens of thousands of modular products to all parts of the world, including modular hotels, apartments, schools, hospitals, data centers, etc.
Key Features
BIM (Building Information Modeling) uses Revit software to provide comprehensive construction information through three-dimensional expression. Modular buildings have high requirements for design refinement and professional collaboration, installation errors are calculated in millimeters, and prefabricated modular components are difficult to modify once they are produced. Building integration introduces advanced BIM technology to establish 3D model of project engineering through data engineering, so that the structure and construction of the building can be expressed in a concrete and intuitive way, thus improving the engineering quality of prefabricated building products. BIM technology can provide three-dimensional design solutions for the structure, decoration, installation and packaging of modular projects, so that the construction integration can better manage materials and resources, improve logistics efficiency, reduce transportation costs, greatly reduce errors and improve accuracy, so as to achieve the improvement of construction efficiency.
Signature Projects
Proposed Transitional Housing at various lots in D.D. 105 and adjoining government land, Ngau Tam Mei, Yuen Long, N.T.
Client: | Evangelical Lutheran Church Social Service - Hong Kong |
Main Contractor: | Sun Fook Kong Construction Limited |
Project Role: | MiC supplier |
Types of Module: | Steel |
No. of MiC Modules: | 1,403 |
CFA & GFA (m²): | CFA: 32,240 ; GFA: 30,033 |
No. of Floors: | 4 |
No. of Units: | 1,080 |
Main Contract Period: | 2023 - 2024 |
Other Project features: | The MiC modules of this building combines the advantages of lightweight steel structure and fire-resistant & sound-insulating concrete structure to form an integrated (living room, kitchen, bathroom) component. With a simple connection system design, it can be quickly produced in the factory and assembly quickly on the site. |
Sweden Apartment
Project Role: | MiC supplier |
Types of Module: | Steel |
No. of MiC Modules: | 1,182 |
GFA (m²): | 45,000 |
No. of Floors: | 7 |
Main Contract Period: | 2017 - 2018 |
Cuiyuan High School Dongxiao Campus
Client: | Shenzhen CIMC Architectural Design Institute Limited Company |
Project Role: | MiC supplier |
Types of Module: | Steel |
No. of MiC Modules: | 74 |
GFA (m²): | 3,253 |
No. of Floors: | 2 |
Main Contract Period: | 2020 - 2021 |
Zhuhai Hospital
Project Role: | MiC supplier |
Types of Module: | Steel |
No. of MiC Modules: | 129 |
GFA (m²): | 4,032.68 |
No. of Floors: | 3 |
Main Contract Period: | 2017 - 2018 |
Djibouti International Hotel
Client: | Shenzhen CIMC Architectural Design Institute Limited Company |
Project Role: | MiC supplier |
Types of Module: | Steel |
No. of MiC Modules: | 203 |
GFA (m²): | 6,640.43 |
No. of Floors: | 4 |
Main Contract Period: | 2020 - 2024 |
Philippine Distribution Box
Client: | Shenzhen Zhongxing Kangxun Electronics Co., LTD |
Project Role: | MiC supplier |
Types of Module: | Steel |
No. of MiC Modules: | 6 |
GFA (m²): | 178 |
No. of Floors: | 1 |
No. of Units: | 6 |
Main Contract Period: | 2023 |
MiC Part: | Transformer, UPS, battery pack, operation cabinet, data cabinet |