Remacbox Originality Company Limited

Owned by Midea Real Estate Group, aim for developing building industrialisation. Their unique operating mode 'REMAC', Research, Estate, Manufacture, Accommondate chain, Construction. They are committed to create a whole module-building industrial cluster platform with Smart-Construction as the center. Now, The Pearl River Delta Economic Zone(PRD), Yangtze Delta and Beijing-Tianjin-Hebei region are on their layout. In order to form a R&D system covering the whole industry chain and to booster construction industrialisation.

 

There are six technology research institute are conducting in-depth study in Building, Engineering, Information, Equipment, Materials and Manufacturing Technologies.

 

They are committed to providing comprehensive solutions for Prefabricated module building industrial, including: R&D, design, production and engineering services of assembly buildings, intelligent household products such as R&D, design, production services of integral bathroom and kitchen. R&D, design, production and sales services of intelligent equipment, new building materials, moulds, special parts, etc. In the future, Remac Technology will continue to promote the industrialisation of Chinese architecture, adhere to the brand concept of "Create a Better Home With Creative Technologies", and create a better life for tomorrow.

Key Features

Production of Modules, Transportation of Modules and On-site Installation


Mock-ups and prototypes of each type of module are fabricated, checked and tested before mass production, Trial assembly/stacking of modules in the factory should be carried out, On-site construction activities, such as piling/foundation works, external underground utility works, etc., can be carried out concurrently.                           

 

Special traffic arrangement needs to be made for transportation of modular units with width larger than 2.5 meters, Temporary storage location may need to be arranged, subject to the delivery and construction programme.                                                                                                                                                                                                                                      
Upon stacking of modules, temporary waterproofing is required to be carried out before completion of permanent waterproofing, Connection of module to module/module to core parts (Structural and Mechanical, Electrical & Plumping Systems) needs to be made.

Signature Projects

Transitional Housing Project at Former Wing On School

Tai Shu Ha Road West, Yuen Long

Client: Hong Kong Youth Affairs Development Foundation
Project Role: MiC Modules Supplier
Types of Module: Steel
No. of MiC Modules: 283
CFA & GFA (m²): CFA:7,200 ; GFA:6,800
No. of Floors: 4
No. of Units: Conversion of 1 no. single-storey building and construction of 1 no. three-storey to four-storey building
21 nos. 1-person units
218 nos. 1/2-person units
21 nos. 3-person units
1 no. 2/3-person barrier free unit
Main Contract Period: Q3 2023 to Q2 2024
MiC Part: Each living room unit will be equipped with a bathroom with toilet and a cooking area
Last Updated: 22.03.2024 10:48:55

Adopting MiC to Build Light Public Housing (LPH) to Expedite Housing Supply

The Policy Address 2022 announced the construction of LPH. The LPH Scheme is led by the Architectural Services Department with the adoption of MiC. The Housing Bureau has selected eight sites in Tuen Mun, Yuen Long, Ma On Shan, Kai Tak, Ngau Tau Kok and Chai Wai, providing around 30,000 LPH units. The construction period takes only one to two years. Each units equipped with self-contained toilet and basic facilities such as water heater and air-con. The first batch of around 2,100 units will be completed in 2024-25 and the remaining units will be completed by phases in 2025-26 and 2026-27, so as to shorten the waiting time of public housing.