Owned by Midea Real Estate Group, aim for developing building industrialisation. Their unique operating mode 'REMAC', Research, Estate, Manufacture, Accommondate chain, Construction. They are committed to create a whole module-building industrial cluster platform with Smart-Construction as the center. Now, The Pearl River Delta Economic Zone(PRD), Yangtze Delta and Beijing-Tianjin-Hebei region are on their layout. In order to form a R&D system covering the whole industry chain and to booster construction industrialisation.
There are six technology research institute are conducting in-depth study in Building, Engineering, Information, Equipment, Materials and Manufacturing Technologies.
They are committed to providing comprehensive solutions for Prefabricated module building industrial, including: R&D, design, production and engineering services of assembly buildings, intelligent household products such as R&D, design, production services of integral bathroom and kitchen. R&D, design, production and sales services of intelligent equipment, new building materials, moulds, special parts, etc. In the future, Remac Technology will continue to promote the industrialisation of Chinese architecture, adhere to the brand concept of "Create a Better Home With Creative Technologies", and create a better life for tomorrow.
Key Features
Production of Modules, Transportation of Modules and On-site Installation
Mock-ups and prototypes of each type of module are fabricated, checked and tested before mass production, Trial assembly/stacking of modules in the factory should be carried out, On-site construction activities, such as piling/foundation works, external underground utility works, etc., can be carried out concurrently.
Special traffic arrangement needs to be made for transportation of modular units with width larger than 2.5 meters, Temporary storage location may need to be arranged, subject to the delivery and construction programme.
Upon stacking of modules, temporary waterproofing is required to be carried out before completion of permanent waterproofing, Connection of module to module/module to core parts (Structural and Mechanical, Electrical & Plumping Systems) needs to be made.
Signature Projects
Transitional Housing Project at Former Wing On School
Client: | Hong Kong Youth Affairs Development Foundation | |||||||||||||||||||||||||||||
Project Role: | MiC Modules Supplier | |||||||||||||||||||||||||||||
Types of Module: | Steel | |||||||||||||||||||||||||||||
No. of MiC Modules: | 283 | |||||||||||||||||||||||||||||
CFA & GFA (m²): | CFA:7,200 ; GFA:6,800 | |||||||||||||||||||||||||||||
No. of Floors: | 4 | |||||||||||||||||||||||||||||
No. of Units: | Conversion of 1 no. single-storey building and construction of 1 no. three-storey to four-storey building 21 nos. 1-person units 218 nos. 1/2-person units 21 nos. 3-person units 1 no. 2/3-person barrier free unit |
|||||||||||||||||||||||||||||
Main Contract Period: | Q3 2023 to Q2 2024 | |||||||||||||||||||||||||||||
MiC Part: | Each living room unit will be equipped with a bathroom with toilet and a cooking area |