Symbolised by a pioneering spirit and innovative engineering design, Goldwave has led the charge in delivering cost-effective and mission-critical steel structure solutions in Hong Kong since 2011.
Within a decade, Goldwave's diverse projects of varying disciplines have significantly impacted the domestic industry with its unparalleled works ranging from steel structure high-rise buildings, heavy lifting mechanical steel structures, civil engineering works and MiC residential housing.
As one of the most prominent Hong Kong-based players, Goldwave is well recognised for its dedication and commit in supplying and erecting steel structures, project management and pre-engineered steel buildings and infrastructures to meet clients' stringent requirements. With its fabrication plant in Guangdong Province next to the marine access, its cutting-edge automation and robotics technology, the company can produce at least 60,000 tons of bespoke steel components annually. This capacity puts Goldwave in a league of its own.
Goldwave’s technical excellence is the fruit of an elite team of men and women of steel. Their collective passion and vision turn the impossible into possible.
Key Features
Goldwave's diverse projects of varying disciplines have significantly impacted the domestic industry with its unparalleled works of precision fabrication and construction ranging from steel structure high-rise buildings, heavy lifting mechanical steel structures, bridges and MiC residential housing.
Signature Projects
Hung Lok Road Transitional Housing Project at Government Land Lot No. GLA-TK821 in Hung Hom
Client: | The Society Rehabilitation and Crime Prevention, Hong Kong |
|||||||||||||||||||||||||||||
Project Role: | MiC Sub-Contractor | |||||||||||||||||||||||||||||
Types of Module: | Steel Structure | |||||||||||||||||||||||||||||
No. of MiC Modules: | 491 | |||||||||||||||||||||||||||||
CFA & GFA: | CFA: 810 m² GFA: 340 m² | |||||||||||||||||||||||||||||
No. of Floors: | 4 | |||||||||||||||||||||||||||||
No. of Units: | 491 | |||||||||||||||||||||||||||||
Main Contract Period: | Q2 2023 - Q2 2024 | |||||||||||||||||||||||||||||
MiC Part: | Full furnished MiC modules, Modular roof panel with frames |