Konwo Modular House Limited

Konwo Modular House Limited is a Hong Kong base company with 30 years experience in design, supply, fabricate and installation of prefabricated and modular house system in Hong Kong.  They set up their own factory in Dongguan in 2000 to support the procurement and fabrication works in China.  They have in-house structural design engineer and Authorized Person/Registered Structural Engineer (AP/RSE) for their design works and Buildings Department (BD) submission, and they have direct labours in different trade including civil workers, riggers, electricians and plumbers, etc.  for the site construction works.  Over the past few years, MiC system became popular in Hong Kong construction industry, and they had design, supply, fabricate and install MiC site offices/buildings for Architectural Services Department (ArchSD), Civil Engineering and Development Department (CEDD), Drainage Services Department (DSD) and The Airport Authority Hong Kong (AAHK) with their well designed MiC system.  In June 2022,  they had obtained In-principle Acceptance (IPA) from BD for their steel MiC System (Acceptance Reference No. MiC 10/2022).  

Key Features


Konwo's MiC System is well designed by their own professional team with over 30 years experience in modular house industry, and their MiC System is deisgned feasible for re-locate and re-use with easy dis-assembly and re-assembly.  They have relocated twice of their MiC site office from Fanling to Tin Shui Wai, and from Tin Shui Wai to Kowloon Tong for three projects from ArchSD.

Signature Projects

DC/2021/07 - Relocation of Sha Tin Sewage Treatment Works to Caverns –Upstream Sewerage Works – Advance Works

Hong Lok Yuen, Fanling

Project Client: DSD
Project Role: Design (with ICE), supply, fabricate and install the MiC site office
Types of Module: Steel
No. of MiC Modules: 62
CFA / GFA (m²): CFA: 1,116; GFA: 558
No. of Floors: 2
No. of Units: 1
Project Period: Sep 2022 to Jan 2023 (Sub-Contract Works Period)

SS G514 - Construction of Two 30-classroom Primary Schools at Queen's Hill, Fanling

Queen's Hill, Fanling

Project Client: ArchSD
Project Role: Design (with ICE), supply, fabricate and install the MiC site office
Types of Module: Steel
No. of MiC Modules: 34
CFA / GFA (m²): CFA: 510;  GFA: 255
No. of Floors: 2
No. of Units: 1
Project Period: Jul 2019  to Oct 2019  (Sub-Contract Works Period)

SS J507 - Tin Tsui Wai Swimming Pool Complex

Area 107, Tin Shui Wai

Project Client: ArchSD
Project Role: Relocation of MiC site office with ICE design certificate
Types of Module:  Steel
No. of MiC Modules: 34
CFA / GFA (m²): CFA: 510m2; GFA:  255m
No. of Floors: 2
No. of Units: 1
Contract Period: 2020 Oct to 2020 Dec (Sub-Contract Works Period)
Other Project Features Relocation of existing MiC site office from Fanling (ArchSD Contract No. SS G514)

SS L506 - Construction of Two Special Schools at Renfrew Road, Kowloon Tong

Renfrew Road, Kowloon Tong

Project Client: ArchSD
Project Role: Relocation of MiC site office with ICE design certificate
Types of Module: Steel
No. of MiC Modules: 34
CFA / GFA (m²): CFA: 510;  GFA: 255
No. of Floors: 2
No. of Units: 1
Project Period: Dec 2022 to Feb 2023 (Sub-Contract Works Period)
Other Project Features: Relocation of existing MiC site office from Tin Shui Wai (ArchSD Contract No. SS J507)

SS J501 - Design and Construction of Hospital Authority Supporting Service Centre in North Lantau

Renfrew Road, Kowloon Tong

Project Client: ArchSD
Project Role: Design (with ICE), supply, fabricate and install the MiC site office
Types of Module: Steel
No. of MiC Modules: 60
CFA / GFA (m²): CFA: 1,170;  GFA: 585
No. of Floors: 2
No. of Units: 1
Project Period: Feb 2021 to June 2021 (Sub-Contract Works Period)

CV/2022/04 - Reconstruction of Yi O Pier and Ma Wan Chung Pier

Hei Tung Street, Tung Chung

Client: CEDD
Project Role: Design (with ICE), supply, fabricate and install the MiC site office
Types of Module:  Steel
No. of MiC Modules: 24
CFA / GFA (m²): CFA: 370m2;  GFA: 185m
No. of Floors: 2
No. of Units: 1
Contract Period: 2022 Nov to 2023 Jan (Sub-Contract Works Period)

CV/2017/07 - Site Formation and Infrastructure Works at Wang Chau, Yuen Kong - Contract 1

Ko Po San Tsuen, Yuen Long

Project Client: CEDD
Project Role: Design (with ICE), supply, fabricate and install the MiC site office
Types of Module:  Steel
No. of MiC Modules: 28
CFA / GFA (m²): CFA: 504m2; GFA: 252m
No. of Floors: 2
No. of Units: 1
MiC Part: 2020 Oct to 2021 Jan (Sub-Contract Works Period)

Contact Information

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 08.03.2023 10:50:31

Quickly build high-quality Light Public Housing with MiC

The Policy Address 2022 announced the construction of Light Public Housing (LPH)

The LPH Scheme will be led by the Architectural Services Department with the adoption of MiC. The Housing Bureau has selected eight sites in Tuen Mun, Yuen Long, Ma On Shan, Kai Tak, Ngau Tau Kok and Chai Wai, providing around 30,000 LPH units. The construction period takes only one to two years. Each units equipped with self-contained toilet and basic facilities such as water heater and air-con. The first batch of around 2,100 units will be completed in 2024-25 and the remaining units will be completed by phases in 2025-26 and 2026-27, so as to shorten the waiting time of public housing.

HOT TOPIC