Markbox Innovation Limited

MARKBOX was established in the year of 2016. Through more than 3 years of continuous research and hard work, they have created the emerging world of the future through the combination of safe building, innovation and technology, environmental protection, project management and future development etc., to realise a wisdom city of new world. To provide the world with a more comfortable, safety and environmentally friendly living space.

 

They have a strong sense of social responsibility which reflected in their project practice as following:

 

In 2017, providing the Pop Up Store to HKTB in Hong Kong Dragon Boat Carnival
In 2018, assisting Hanergy Solar Group Limited to implement and promote the development of green energy of Hong Kong solar energy project
In 2019, became a supplier of Pre-accepted MiC system in Buildings Department
In 2020, cooperating with the local research institute “NAMI” to develop new building materials, including assembly and synthesis of frequently used fireproof materials; green energy equipment (Lithium iron phosphate battery) in cooperation with Shenzhen Polytechnic; and container aquaculture circulation system in cooperation with Guangdong Ocean University 
Starting from 2021, also provide consulting service of Pre-accepted MiC Systems to assist subcontractors to obtain accreditation by Buildings Department

 

Key Features

Courtesy of Markbox

Production of Modules


Mock-ups and prototypes of each type of module are fabricated, checked and tested before mass production, Trial assembly/stacking of modules in the factory should be carried out, On-site construction activities, such as piling/foundation works, external underground utility works, etc., can be carried out concurrently 

Courtesy of Markbox

Transportation of Modules


Special traffic arrangement needs to be made for transportation of modular units with width larger than 2.5 meters, Temporary storage location may need to be arranged, subject to the delivery and construction programme.    

Courtesy of Markbox

On-site Installation


Upon stacking of modules, temporary waterproofing is required to be carried out before completion of permanent waterproofing, Connection of module to module/module to core parts (Structural and Mechanical, Electrical & Plumping Systems) needs to be made.

Signature Projects

Courtesy of Markbox

FEHD Skylight Market

Tin Sau Road, Tin Shui Wai

Client:

Architectural Services Department

Project Role: MiC supplier
Types of Module: Steel
No. of MiC Modules: 26
MiC CFA (m²): 418
No. of Floors: 1
No. of Units: 39 (Including Stall No. 1 to No. 36, Pump Room and Garbage Room)
Main Contract Period: 2019 - 2020
MiC Part: All modules were 100% internally completed with decoration and  fittings in the factory.

 

PROJECT DETAILS

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 12.10.2021 12:47:04

New Isolation Facilities in Hong Kong

Alleviate demand pressure for isolation by MiC and DfMA

In view of the 5th wave of the COVID-19, new isolation facilities and Pop-up Community Vaccination Centres were built by MiC and DfMA with full speed. Eight Community Isolation Facilities projects from China State Construction International providing over 50,000 isolation beds. Supported by the Central Government, the Lok Ma Chau Loop Hospital for Emergency was completed in April 2022. Meanwhile, two MiC transitional housing projects were used as community isolation facilities, providing more than 2,500 units.