Wing Hong Shun Enterprises Limited

Wing Hong Shun Enterprises Limited was established in 2007.  Its Hong Kong office is located in Shek Mun, Shatin.  We are mainly engaged in professional projects related to the production and supply of precast concrete elements.  Our products include facades, staircases, slabs, beams, volumetric precast kitchen(s) and bathroom(s), structural walls, semi-precast water tanks, partition walls, refuse chutes, parapet walls, precast half-landing(s), MIC products, light-weight panel walls and precast cooking bench with zinc unit. 

 

Huizhou City Wing Hong Shun Construction Materials Co., Ltd., a self-built prefabrication plant, is located in Boluo, Huizhou, China.  The location is very superior.  It is only 120 kilometers away from Hong Kong.  The products are transported by 30-ton trucks and can reach Hong Kong within 2.5 hours.  Our fabrication plant is divided into three zones, namely A/B/C, with a total area of 190,400m² and the annual output is more than 180,000 tons. 

 

The company has obtained ISO 9001:2015 quality system certification, ISO 14001:2015 environmental management system certification, ISO 45001:2018 occupational health and safety management system certification and QSPSC: 2014 design, production and supply of ready mixed concrete certification. In 2020 and 2022, we have successfully obtained the IPA of concrete MiC system and steel MiC system from the Hong Kong Buildings Department (BD’s Acceptance Ref. No.: MiC 13/2020, MiC 4/2022 and MiC 3/2023) and becoming an on-list MiC supplier. 

Last Updated: 21.03.2024 17:28:24

Adopting MiC to Build Light Public Housing (LPH) to Expedite Housing Supply

The Policy Address 2022 announced the construction of LPH. The LPH Scheme is led by the Architectural Services Department with the adoption of MiC. The Housing Bureau has selected eight sites in Tuen Mun, Yuen Long, Ma On Shan, Kai Tak, Ngau Tau Kok and Chai Wai, providing around 30,000 LPH units. The construction period takes only one to two years. Each units equipped with self-contained toilet and basic facilities such as water heater and air-con. The first batch of around 2,100 units will be completed in 2024-25 and the remaining units will be completed by phases in 2025-26 and 2026-27, so as to shorten the waiting time of public housing.

HOT TOPIC