“Huoshenshan” Hospital

Wuhan, China
Courtesy of Xinhuanet and Mingpao

By the use of MiC structure with DfMA fitout, the "Huoshenshan" Hospital in Wuhan, as one of the emergency hospitals, was built in only ten days by the local government in response to severe outbreak of Coronavirus Disease 2019 (COVID-19) in Wuhan. After handover, the hospital officially started accepting patients of Coronavirus Disease 2019 (COVID-19) in the morning on 3 February 2020. 

  • Contractor: China State Construction Engineering Corporation (CSCEC)
  • Number of storey: 2
  • 33,940 sqm construction area
  • Unit size: 100 ft² (can hold 2 beds)
  • No. of MiC modules: 1800
  • Facilities including 1000 beds, ICU, Negative Pressure Wards, Patient Wards, Consultation Rooms, Medical Equipment Rooms etc.
  • Project Construction Period: 10 days (24/1/2020 – 2/2/2020)

 

Reference: CSCEC

Last Updated: 23.12.2020 14:45:21

Quickly build high-quality Light Public Housing with MiC

The Policy Address 2022 announced the construction of Light Public Housing (LPH)

The LPH Scheme will be led by the Architectural Services Department with the adoption of MiC. The Housing Bureau has selected eight sites in Tuen Mun, Yuen Long, Sheung Shui, Kai Tak, Ngau Tau Kok and Chai Wai, providing around 30,000 LPH units. The construction period takes only one to two years. Each units equipped with self-contained toilet and basic facilities such as water heater and air-con. The first batch of around 2,100 units will be completed in 2024-25 and the remaining units will be completed by phases in 2025-26 and 2026-27, so as to shorten the waiting time of public housing.

HOT TOPIC