“Huoshenshan” Hospital

Wuhan, China
Courtesy of Xinhuanet and Mingpao

By the use of MiC structure with DfMA fitout, the "Huoshenshan" Hospital in Wuhan, as one of the emergency hospitals, was built in only ten days by the local government in response to severe outbreak of Coronavirus Disease 2019 (COVID-19) in Wuhan. After handover, the hospital officially started accepting patients of Coronavirus Disease 2019 (COVID-19) in the morning on 3 February 2020. 

  • Contractor: China State Construction Engineering Corporation (CSCEC)
  • Number of storey: 2
  • 33,940 sqm construction area
  • Unit size: 100 ft² (can hold 2 beds)
  • No. of MiC modules: 1800
  • Facilities including 1000 beds, ICU, Negative Pressure Wards, Patient Wards, Consultation Rooms, Medical Equipment Rooms etc.
  • Project Construction Period: 10 days (24/1/2020 – 2/2/2020)

 

Reference: CSCEC

Last Updated: 23.12.2020 14:45:21

HKICC and Quarantine Camps

To fight COVID-19, the HKSAR Government has built the North Lantau Hospital Hong Kong Infection Control Centre (HKICC) next to the AsiaWorld-Expo providing 136 negative pressure wards which were designed with reference to the standards of tier-1 isolation wards that could accommodate 816 beds. The HKICC adopted MiC method and was completed in merely 4 months (Sep 2020 – Jan 2021). It will open on 26 February 2021.

From blueprint to scale

05.03.2021 Hospital Authority

Infection control centre to open

25.02.2021 HKSAR Government

Temporary hospital completed

20.01.2021 HKSAR Government

Penny's Bay Quarantine Camp Phase 4

07.01.2021 AluHouse

同心抗疫: 鯉魚門檢疫單位投入運作 (Chinese only)

03.03.2020 Information Services Centre

HOT TOPIC