Trunk Road T2 and Infrastructure Works for Developments at the Former South Apron

Trunk Road T2 and Cha Kwo Ling Tunnel
Bouygues Travaux Publics (Hong Kong Branch)

Trunk Road T2 and Cha Kwo Ling Tunnel is a Sub-sea TBM tunnel project for the construction of 2 tubes of 2-lane highways connecting the CKR and TKOLTT tunnel in Route 6. The TBM diameter is 14m and there will be 3 levels in the completed tunnel structure, namely Over Head Ventilation Duct (OHVD), Road level and Service Gallery (SG) level. The total length of the SG is 2.6km long in each tunnel tube for future maintenance and operation without hindering road level tunnel traffic.

 

The project is a pioneer in adopting MiMEP solution inside the SG level with prefabricated ceiling and wall modules along the 2.6km tunnel. Besides, robotics is adopted extensively for the implementation of MiMEP solution such as the Drilling Robot and the Jacking Table.

Highlights on Current Status

Modules Manufacturing

Project Current Status

Under Construction

No. of MiMEP Modules

1,403

CFA (m²)

N/A

MiMEP CFA (m²)

4,680

Superstructure Storeys

N/A

MiMEP Storeys

N/A

MiMEP Area to CFA in Typical floors (%)

N/A

Commencement Date

Nov 2019

Anticipated Date of Completion

Dec 2026

MiMEP Coverage (%)

80

Construction Commencement

Nov 2019

Date of Completion

Dec 2026

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 30.09.2026 15:00:02

About MiMEP

Multi-trade Integrated Mechanical, Electrical and Plumbing (MiMEP) is the integration of multi-trade building services components, into a single volumetric assembly of prefabricated modules, manufactured off-site in a workshop, then transported to the site for connection of modules to complete various trades of building services installations to minimise on-site works. MiMEP can integrate with structural element, architectural builders’ works and finishes (ABWF) to form an advanced assembly, such as false ceiling unit and plant room unit to enhance the productivity.

About MiMEP