China State Construction Engineering (Hong Kong) Limited

China State Construction Engineering Corporation (China State Hong Kong) started its construction business in Hong Kong since 1979. The Company engages in building construction and civil engineering operations.

 

China State Hong Kong is amongst the largest construction contractors in Hong Kong. As approved by the Works Bureau, it is on the List of Approved Contractors (Group C) for Public Works for the categories of Buildings, Port Works, Roads and Drainage, Site Formation and Waterworks.

 

China State Hong Kong plays an active role in construction industry by means of its sound and quality management, and has core capabilities in mastering high quality and technically advanced projects. It has undertaken over 800 projects in Hong Kong and Macau over the past 40 years, accumulating copious amounts of experiences and prominent capabilities. Projects undertaken range from building works of public housing, private residential, office / commercial, industrial, hospital institutions, educational and cultural facilities, hotels, public institutions (such as Hong Kong International Airport Passenger Terminal Building); to civil engineering works of site formation, highways, bridges, reclamation and tunnel projects; as well as piling, mechanical and electrical engineering works.

 

The parent company, China State Construction International Holdings Limited (CSCI ) is a vertically integrated construction and investment conglomerate. In July 2005, CSCI was listed on the Main Board of The Hong Kong Stock Exchange.

Signature Projects

Courtesy of CSCEC

Temporary Quarantine Facilities at Lei Yue Mun Park and Holiday Village (Site A)

75 Chai Wan Road

Client: Architectural Services Department
Project Role: Main contractor
No. of Modules 118
Type of MiC: Steel    
CFA/GFA: 2,052 m2/1,977 m2
Number of Floors: 1
Number of Units: 118
Project Period: 25 days 
MiC Part: Quarantine rooms
Other project feature: First newly-built quanrantine facility in Hong Kong
Courtesy of CSCEC

Temporary Quarantine Facilities at Lei Yue Mun Park and Holiday Village (Site B)

75 Chai Wan Road

Client: Architectural Services Department
Project Role: Main contractor
No. of Modules: 234
Type of MiC: Steel    
CFA/GFA: 6,077 m2/5,976 m2
Number of Floors: 1&2
Number of Units: 234
Project Period: 55 days
MiC Part: Quarantine rooms
Other Project Feature: Designed and constructed for permenant use
Courtesy of CSCEC

Design and Construction of Temporary Quarantine Facilities at Penny's Bay (Phase IB)

Fantasy Road, Penny's Bay

Client: Architectural Services Department
Project Role: Main contractor
No. of Modules: 702
Type of MiC: Steel  
CFA/GFA: 19,982 m2/18,188 m2             
Number of Floors: 2
Number of Units: 700
Project Period: 73 days
MiC Part: Quarantine rooms & medical posts
Other Project Feature: Designed and constructed for permenant use
95% prefabrication rate
Courtesy of CSCEC

Design and Construction of Temporary Quarantine Facilities at Penny's Bay (Phase 3B)

Fantasy Road, Penny's Bay

Client: Architectural Services Department
Project Role: Main contractor
No. of Modules: 1,495
Type of MiC: Steel
CFA/GFA: 26,195 m2/ 25,634 m2
Number of Floors: 2
Number of Units: 850
Project Period: 88 days
MiC Part: Quarantine rooms, staircases, corridors, medical posts etc.
Other Project Feature:  Designed and constructed for permenant use

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 10.06.2021 14:28:35

About MiMEP

Multi-trade Integrated Mechanical, Electrical and Plumbing (MiMEP) is the integration of multi-trade building services components, into a single volumetric assembly of prefabricated modules, manufactured off-site in a workshop, then transported to the site for connection of modules to complete various trades of building services installations to minimise on-site works. MiMEP can integrate with structural element, architectural builders’ works and finishes (ABWF) to form an advanced assembly, such as false ceiling unit and plant room unit to enhance the productivity.

About MiMEP