Leighton Contractors (Asia) Limited

Established in 1975, headquartered in Hong Kong, Leighton Asia delivers a portfolio of high-profile infrastructure projects throughout Asia.

 

As a proven leader in the delivery of complex tunnel, rail and road networks, Leighton Asia also delivers turn-key renewable energy infrastructure including utility-scale wind, geothermal energy and waste-to-power installations. Its building projects range from schools, embassies and luxury high-rise residential towers, to large scale leisure complexes, a growing number of which are built to international green building and energy efficiency standards.

 

Their Mission is to generate sustainable returns for the shareholders by delivering projects for the clients while providing safe, rewarding and fulfilling careers for people.

 

Leighton Asia currently operates in Hong Kong, Macau, Singapore, Philippines, Indonesia, Malaysia and India.

 

Leighton Asia is a member of the CIMIC Group, an engineering-led construction, mining, services and public private partnerships leader with a history dating back to 1899.

Key Features

Courtesy of Leighton Asia


Leighton Asia is one of the only companies in Hong Kong who has achieved the British Standards Institute Kitemark for excellent in Building Information Management to the new international ISO 19650 standards series.

 

They are fully integrating BIM to coordinate reliable information about a project from design through construction and into the operation of the asset.

Signature Projects

Courtesy of Leighton Asia

Hong Kong-Zhuhai-Macao Bridge Boundary Control Point Passenger Clearance Building

Hong Kong-Zhuhai-Macao Bridge Boundary Control Point

Client: Highways Department, HKSAR Government 
Project Role: Main Contractor
No. of Modules: 45 No. of Roof Modules
CFA/GFA: Approx. 60,000 m2 (Area of the roof)
Main Contract Period: April 2014 to Nov 2016
MiC Part: Roof construction and erection
Other Project features:
  • One of the largest and most complex offsite fabrication and modular roof constructions ever executed in Hong Kong.
  • The Passenger Clearance Building (PCB) is close to Hong Kong International Airport and the highest point of the roof is just two metres below the airport height restriction, which posed great challenges to erection of the roof.
  • The biggest and heaviest roof module  is about 60m x 25m in size and weighing up to 690 tonnes.
  • The PCB is close to Hong Kong International Airport and the highest point of the building’s architecture roof is just two metres below the airport height restriction.
  • 85% of the building services and architectural builders works and finishes of the roof were installed off-site in controlled factory conditions, mitigating significant safety risks, especially working at height.
  • This MiC solution brought forth the benefits of increased productivity, safety and cost-efficiency. The roof installation was structurally completed in seven months.

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 19.03.2021 12:51:31

Adopting MiC to Build Light Public Housing (LPH) to Expedite Housing Supply

The Policy Address 2022 announced the construction of LPH. The LPH Scheme is led by the Architectural Services Department with the adoption of MiC. The Housing Bureau has selected eight sites in Tuen Mun, Yuen Long, Ma On Shan, Kai Tak, Ngau Tau Kok and Chai Wai, providing around 30,000 LPH units. The construction period takes only one to two years. Each units equipped with self-contained toilet and basic facilities such as water heater and air-con. The first batch of around 2,100 units will be completed in 2024-25 and the remaining units will be completed by phases in 2025-26 and 2026-27, so as to shorten the waiting time of public housing.