Ronald Lu & Partners (RLP)

Ronald Lu & Partners (RLP) is an award-winning architecture practice focused on human-centric, future-ready design. Founded in 1976, RLP is known throughout Asia as being a trailblazer in sustainable architecture. For more than 46 years, their deep roots in China and their international perspective have allowed them to build a global portfolio spanning green architecture, master planning, transit-oriented development, and interior design. Working in partnership with many of the world’s leading developers, government bodies and institutions, they bring the values of their clients to life in high-density urban environments to “Design Better Life” for the people and communities that use these spaces.

Key Features

Courtesy of RLP

Redefine sustainability


Ronald Lu and Partners is known throughout Asia as a pioneer of sustainable architecture. Recognised as industry leaders, many of their accredited professionals have achieved a BEAM Pro or equivalent international standard, continuously driving sustainability throughout our firm. RLP committed to excellence in design and construction, and to maximising opportunities to provide greater environmental benefits for communities across Asia and beyond.

 

The expertise of RLP is integrated into our extensive range of design services which includes master planning, new build, interior design, urban regeneration and architectural research. We deliver projects ranging from BEAM Plus assessment standard and international equivalents up to the state-of-the-art “zero carbon” buildings.

Signature Projects

Courtesy of RLP

Design and Construction of Temporary Quarantine Facilities at Penny's Bay (Phase II), Lantau Island, New Territories

Penny's Bay, Lantau Island, New Territories

Client: Architectural Services Department
Project Role: AP/ Design Consultant
Type of Modules: Steel
No. of MiC Modules: 707
CFA/GFA: 27,852 m²/ 20,608 m²
No. of Floors: 2
No. of Units: 707
Main Contract Period: Jul 2020 - Sep 2020 (90 days)
MiC Part: All Habitable Units and Staff Units
Other Project features:
  1. Full BIM coordination project;
  2. Fast track approval and construction
Courtesy of RLP

Dedicated Rehousing Estate at Hung Shui Kiu Phase 1A

Hung Shui Kiu, Yuen Long, New Territories

Client: Hong Kong Housing Society
Project Role: AP/ Design Consultant
Type of Modules: Concrete
No. of MiC Modules: 1,225
CFA/GFA: 21,815 m²/ 15,400 m²
No. of Floors: 25
No. of Units: 300
Main Contract Period: Jun 2021 - Jun 2024 
MiC Part: Balcony/ Living/ Dining/ Bedroom/ Bathroom/ Kitchen/ RSMRR/ ELE rooms/ Water Meter Cabinet
Other Project features: Full BIM implementation
Courtesy of RLP

Proposed Residential Development at Tonkin Street & Fuk Wing Street

Sham Shui Po, Hong Kong

Client: Chinachem Group
Project Role: AP
Type of Modules: Concrete
No. of MiC Modules: 684
CFA/GFA: 14,877 m²/ 9,674.91 m²
No. of Floors: 26
No. of Units: 183
Main Contract Period: 2020 - 2024
MiC Part: Residential Units
Courtesy of RLP

In-principle Acceptance of Concrete Modular Integrated Construction (MIC) for High Rise Residential Development


Client: Gammon Construction Limited
Project Role: AP
Type of Modules: Concrete
No. of MiC Modules: 936
No. of Floors: 40
No. of Units: 234
MiC Part: Living Room/ Dinning Room/ Bedroom/ Kitchen/ Bathroom
Other Project features: Non-site specific design of MiC system for high rise residential building
Courtesy of RLP

In-principle Acceptance of Steel Modular Integrated Construction (MIC) for High Rise Residential Development


Client: Gammon Construction Limited
Project Role: AP
Type of Modules: Hybrid Steel
No. of MiC Modules: 475
No. of Floors: 20
No. of Units: 133
MiC Part: Living Room/ Dinning Room/ Bedroom/ Kitchen/ Bathroom
Other Project features: Non-site specific design of MiC system for high rise residential building

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 13.06.2022 09:55:44

Adopting MiC to Build Light Public Housing (LPH) to Expedite Housing Supply

The Policy Address 2022 announced the construction of LPH. The LPH Scheme is led by the Architectural Services Department with the adoption of MiC. The Housing Bureau has selected eight sites in Tuen Mun, Yuen Long, Ma On Shan, Kai Tak, Ngau Tau Kok and Chai Wai, providing around 30,000 LPH units. The construction period takes only one to two years. Each units equipped with self-contained toilet and basic facilities such as water heater and air-con. The first batch of around 2,100 units will be completed in 2024-25 and the remaining units will be completed by phases in 2025-26 and 2026-27, so as to shorten the waiting time of public housing.