The Construction Industry Council (CIC) strives to promote greater uptake of DfMA and offsite construction techniques in the Hong Kong construction industry. While concrete prefabricated components and modules have been adopted in the local construction industry, there is considerable potential for Mechanical, Electrical and Plumbing (MEP) designers and builders to adopt the DfMA approach to help deliver high quality building services works more efficiently than using the traditional design for insitu construction approach.

In this webinar, we are privileged to have DfMA experts from Hong Kong and overseas to share their insights and experience in DfMA adoption in MEP works. Strategies and measures for embracing this design approach will be presented and discussed.

 

Webinar's Highlights

  • How to adopt DfMA - perspectives of MEP contractor and manufacturer
  • DfMA MEP case studies
  • Essence of DfMA along the production chain
  • Formulation of DfMA MEP ecosystem

 

REPLAY   DOWNLOAD PRESENTATION MATERIALS

Details:

Date: 15 October 2020 (Thursday)

 

Time: 3:00pm - 5:00pm (HKT) / 8:00am-10:00am (UKT)

 

Language: English

 

Speakers:

  • Ir CK WONG, Vice President of Building Engineering (MEP), AECOM Hong Kong
  • Mr Dale SINCLAIR, Director of Innovation for EMEA, AECOM
  • Mr Alan CLUCAS, Owner of The Garthfoot Consultancy
  • Mr Lewis JONES , General Manager of Prism Offsite Manufacturing, SES Engineering Services
  • Mr Paul COLLINS, BIM Project Leader of Prism Offsite Manufacturing, SES Engineering Services
  • Mr Chris LEE, Deputy Project Director of BYME Engineering (HK) Ltd

 

Facilitator: 

Ir Dr Sam HUI, Adjunct Assistant Professor at the Department of Mechanical Engineering, The University of Hong Kong

 

 

Rundown:

15:00 – 15:15 Driving DfMA MEP in the HK Construction Industry by Ir CK WONG

 

15:15 – 15:35 Overview of DfMA in UK since the RIBA Plan of Work 2013 by Mr Dale SINCLAIR

 

15:35 – 15:40 Q&A Session

 

15:40 – 16:00 DfMA MEP from the perspective of Tier 1 Contractor by Mr Alan CLUCAS

 

16:00 – 16:20 DfMA MEP from the perspective of MEP contractor/Off site manufacturer by Mr Paul NEWBY, Mr Lewis JONES and Mr Paul COLLINS

 

16:20 – 16:40 DfMA MEP case studies in different regions by Mr Chris LEE

 

16:40 – 17:00 Q&A Session facilitated by Ir Dr. Sam HUI