李景勳、雷煥庭建築師有限公司 (中文版本 即將推出)

Andrew Lee King Fun & Associates Architects was first established in Hong Kong in 1962 and was incorporated as a limited company in 1998. It is now one of the most innovative and experienced architectural practices in Hong Kong. 

 

Andrew Lee King Fun & Associates Architects Limited has extensive knowledge and expertise in managing large scale and complex institutional, commercial, retail, residential, hospitality, industrial and infrastructural projects for both the public and private sectors, locally and overseas. The teams are dedicated to provide clients with the most personalised professional services, innovative design proficiency and efficient project management. The company provides services in master planning, infrastructure study, building design, interior design, site supervision, project management, and all architecture related professional practices. Over the years, its portfolio has included 800+ satisfactorily completed projects of high prestige in Hong Kong, China, Macau, United States and Vietnam.

 

Its design approach has been contemporary, flexible, and practical to reflect the functional, cultural and contextual requirements of individual project. The company believes this approach will allow the team to produce better innovative design ideas and more sustainable development objectives. Over the years, they have received awards from many different professional organisations acknowledging their pursuit for better architecture. Since the last decade, they have been recognised as one of the top 10 architectural firms in Hong Kong based on annual market shares.

 

 

Address:    19/F Universal Trade Centre, 3 Arbuthnot Road, Central, Hong Kong
Tel: (852) 2525 0008

主要特點

Courtesy of ALKF+

BIM for MiC


MiC units started to be incorporated as a design strategy, thus the methodology of BIM was adapted accordingly with the concept of MIC. In this method, an entire MiC Unit is considered as a MiC unit which is completed with finishes, fixtures, and fittings. The approach of modeling was to create MiC family containing elements from architectural, engineering and MEP disciplines. The family was integrated into the main model like a piece of furniture and was then placed repetitively.

Courtesy of ALKF+

Enhancing BIM Methodology with VR Technology


Building information modeling (BIM) is defined as the process of generating, storing, managing, exchanging, and sharing building information. In the construction industry, the processes and technologies that support BIM are constantly evolving, making the BIM even more attractive. A current topic that requires attention is the integration of BIM  with virtual reality (VR) where the user visualises a virtual world and can interact with it.

Courtesy of ALKF+

BIM + MiC project for Government Statutory Submission


Developed by years, ALKF has experienced in using the BIM model for drawings production for government statutory submission. ALKF is capable to produce drawing and calculation with BIM to facilitate the government requirement as follow,


• Calculate actual provision of GFA & site coverage, & convert to plot ratio & site coverage
• Calculate each room, each compartment & each floor as per MOE CoP
• Support calculate of room capacity for use not defined under CoP
• Provision on Sanitary Fitment
• Provision on Fire Department requirement

標誌性項目

Courtesy of ALKF+

High West Site Development

142 Pok Fu Lam Road, Hong Kong

Client: The University of Hong Kong
No. of Modules: 1, 824
CFA/GFA: 57, 717 m²
Number of Floors: 4 nos. 19-storey of Typical Floor
and 1-storey of Podium
Number of Units: 1, 214
Project Period: 2020 - 2024
MiC Parts: All flat units
Courtesy of ALKF+

BD Pre-Acceptance Submission for Modular Integrated Construction


Client: Paul Y. - iMax Limited
No. of Modules: 400
CFA/GFA: Notional design
Number of Floors: 20
Number of Units: 4
Project Period: 2020
MiC Part: Residential units
Other Project Features: Steel MiC, AC platform included
Courtesy of ALKF+

MiC Pre-acceptance Submission for Proposed Composite Development

Ash Street, Tai Kok Tsui, Hong Kong

Client: Dragages Hong Kong Limited
No. of Modules: 161
GFA: Approx. 417 m²
Number of Floors: 23
Number of Units: 69
Project Period: 2020
MiC Parts: Residential floors 
Other Project Features: Modules with curtain wall, A/C platform 
Courtesy of ALKF+

Public Rental Housing Project

Shek Pai Wan Road, Hong Kong

Client: Hong Kong Housing Society
GFA:

25, 239 m² (Domestic) /

1, 900 m² (Non-Domestic)

Number of Floors: 3 storeys of podium, 25 storeys of residential
Number of Units: 600
Project Period: 2017 - 2024
DfMA Parts: Volumetric Precast Kitchen, Volumetric Precast Bathroom
Courtesy of ALKF+

A 30-Classroom Primary School

Tsuen Wan West Station Development (Site TW7), Hong Kong

Client: Architectural Services Department
No. of Modules: 30 classrooms, 4 Toilets, 1 Pantry
CFA/GFA: 11, 396 m²
Number of Floors: 7 - storey + 1 Floor (Plant Room)
Number of Units:   Classroom Toilet Pantry
  No. of Units: 30 3 1
  Total: 34
Project Period: 2019 - 2024
MiC Parts: Classrooms, Toilets, Pantry
Courtesy of ALKF+

Dedicated Rehousing Estate

Ma Tau Kok, Hong Kong

Client: Hong Kong Housing Society
GFA: 55, 250 m² (Domestic) / 8, 075 m² (Non-Domestic)
Number of Floors: 26 - 28
Number of Units: 1, 100
Project Period: 2020 - 2027
DfMA Parts: Volumetric Precast Kitchen,
Volumetric Precast Bathroom
Courtesy of ALKF+

A 30-classroom Primary School

Site KT2c, Development at Anderson Road, Kwun Tong, Hong Kong

Client: Architectural Services Department
No. of Modules: 25 classrooms, 4 Toilets, 1 Pantry
CFA/GFA: 10, 667 m² / 12, 989 m²
Number of Floors: 7 (G/F-R/F)
Number of Units:   Classroom Toilet Pantry
  Types of Modules: 3 5 1
  No. of Rooms: 25 4 1
  Net MiC Units: 75 20 1
  Total: 96 Units
Project Period: 2018 - 2024
MiC Parts: Classroom, Toilet, Pantry
Other Project Features: MiC & DfMA & Precast

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

最後更新: 31.12.2020 14:56:31

採用MiC興建「簡約公屋」以加快房屋供應

2022年施政報告公佈興建「簡約公屋」。「簡約公屋」計劃由建築署負責,以「組裝合成」建築法興建。房屋局將於屯門、元朗、馬鞍山、啟德、牛頭角及柴灣多區,共八個選址,興建約30,000個「簡約公屋」單位。建築期大約只為一至兩年,單位內有獨立洗手間、煮食空間、冷氣及熱水爐等設施。預計首階段約2,100個「簡約公屋」單位最快可在2024至2025年度落成,其餘單位分別會在2025至2026年度和2026至2027年度分階段落成,期望短時間内改善基層市民的住屋問題。

熱門話題