康禾组合屋有限公司 (中文版本稍后提供)

Konwo Modular House Limited is a Hong Kong base company with 30 years experience in design, supply, fabricate and installation of prefabricated and modular house system in Hong Kong.  They set up their own factory in Dongguan in 2000 to support the procurement and fabrication works in China.  They have in-house structural design engineer and Authorized Person/Registered Structural Engineer (AP/RSE) for their design works and Buildings Department (BD) submission, and they have direct labours in different trade including civil workers, riggers, electricians and plumbers, etc.  for the site construction works.  Over the past few years, MiC system became popular in Hong Kong construction industry, and they had design, supply, fabricate and install MiC site offices/buildings for Architectural Services Department (ArchSD), Civil Engineering and Development Department (CEDD), Drainage Services Department (DSD) and The Airport Authority Hong Kong (AAHK) with their well designed MiC system.  In June 2022,  they had obtained In-principle Acceptance (IPA) from BD for their steel MiC System (Acceptance Reference No. MiC 10/2022).  

主要特点


Konwo's MiC System is well designed by their own professional team with over 30 years experience in modular house industry, and their MiC System is deisgned feasible for re-locate and re-use with easy dis-assembly and re-assembly.  They have relocated twice of their MiC site office from Fanling to Tin Shui Wai, and from Tin Shui Wai to Kowloon Tong for three projects from ArchSD.

标志性项目

DC/2021/07 - Relocation of Sha Tin Sewage Treatment Works to Caverns –Upstream Sewerage Works – Advance Works

Hong Lok Yuen, Fanling

Project Client: DSD
Project Role: Design (with ICE), supply, fabricate and install the MiC site office
Types of Module: Steel
No. of MiC Modules: 62
CFA / GFA (m²): CFA: 1,116; GFA: 558
No. of Floors: 2
No. of Units: 1
Project Period: Sep 2022 to Jan 2023 (Sub-Contract Works Period)

SS G514 - Construction of Two 30-classroom Primary Schools at Queen's Hill, Fanling

Queen's Hill, Fanling

Project Client: ArchSD
Project Role: Design (with ICE), supply, fabricate and install the MiC site office
Types of Module: Steel
No. of MiC Modules: 34
CFA / GFA (m²): CFA: 510;  GFA: 255
No. of Floors: 2
No. of Units: 1
Project Period: Jul 2019  to Oct 2019  (Sub-Contract Works Period)

SS J507 - Tin Tsui Wai Swimming Pool Complex

Area 107, Tin Shui Wai

Project Client: ArchSD
Project Role: Relocation of MiC site office with ICE design certificate
Types of Module:  Steel
No. of MiC Modules: 34
CFA / GFA (m²): CFA: 510m2; GFA:  255m
No. of Floors: 2
No. of Units: 1
Contract Period: 2020 Oct to 2020 Dec (Sub-Contract Works Period)
Other Project Features Relocation of existing MiC site office from Fanling (ArchSD Contract No. SS G514)

SS L506 - Construction of Two Special Schools at Renfrew Road, Kowloon Tong

Renfrew Road, Kowloon Tong

Project Client: ArchSD
Project Role: Relocation of MiC site office with ICE design certificate
Types of Module: Steel
No. of MiC Modules: 34
CFA / GFA (m²): CFA: 510;  GFA: 255
No. of Floors: 2
No. of Units: 1
Project Period: Dec 2022 to Feb 2023 (Sub-Contract Works Period)
Other Project Features: Relocation of existing MiC site office from Tin Shui Wai (ArchSD Contract No. SS J507)

SS J501 - Design and Construction of Hospital Authority Supporting Service Centre in North Lantau

Renfrew Road, Kowloon Tong

Project Client: ArchSD
Project Role: Design (with ICE), supply, fabricate and install the MiC site office
Types of Module: Steel
No. of MiC Modules: 60
CFA / GFA (m²): CFA: 1,170;  GFA: 585
No. of Floors: 2
No. of Units: 1
Project Period: Feb 2021 to June 2021 (Sub-Contract Works Period)

CV/2022/04 - Reconstruction of Yi O Pier and Ma Wan Chung Pier

Hei Tung Street, Tung Chung

Client: CEDD
Project Role: Design (with ICE), supply, fabricate and install the MiC site office
Types of Module:  Steel
No. of MiC Modules: 24
CFA / GFA (m²): CFA: 370m2;  GFA: 185m
No. of Floors: 2
No. of Units: 1
Contract Period: 2022 Nov to 2023 Jan (Sub-Contract Works Period)

CV/2017/07 - Site Formation and Infrastructure Works at Wang Chau, Yuen Kong - Contract 1

Ko Po San Tsuen, Yuen Long

Project Client: CEDD
Project Role: Design (with ICE), supply, fabricate and install the MiC site office
Types of Module:  Steel
No. of MiC Modules: 28
CFA / GFA (m²): CFA: 504m2; GFA: 252m
No. of Floors: 2
No. of Units: 1
MiC Part: 2020 Oct to 2021 Jan (Sub-Contract Works Period)

Contact Information

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

最后更新: 08.03.2023 10:50:31

行政长官2022年施政报告

2022年施政报告公布兴建「简约公屋」

「简约公屋」计划由建筑署负责,以「组装合成」建筑法兴建。房屋局将于屯门、元朗、马鞍山、启德、牛头角及柴湾多区,共八个选址,兴建约30,000个「简约公屋」单位。建筑期大约只为一至两年,单位内有独立洗手间、煮食空间、冷气及热水炉等设施。预计首阶段约2,100个「简约公屋」单位最快可在2024至2025年度落成,其余单位分别会在2025至2026年度和2026至2027年度分阶段落成,期望短时间内改善基层市民的住屋问题。

热门话题